Residential construction wages: Polk, Florida

Wage determination FL20260082 · Active · Standard · verify on SAM.gov

Polk

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$37.01$16.85$53.86
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES$38.01$16.85$54.86
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE$39.01$16.85$55.86
IRONWORKER: REINFORCING AND STRUCTURAL$35.25$17.32$52.57
TRUCK DRIVER: LOWBOY TRUCK$12.10$0.00$12.10
TRUCK DRIVER, INCLUDES DUMP TRUCK$10.22$0.00$10.22
SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION$9.50$0.00$9.50
ROOFER: METAL ROOF$16.99$0.00$16.99
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS)$13.33$0.00$13.33
PLUMBER$13.22$0.00$13.22
OPERATOR: TRACTOR$10.20$0.00$10.20
OPERATOR: TRACKHOE$15.68$0.00$15.68
OPERATOR: SCREED$11.08$0.00$11.08
OPERATOR: ROLLER$11.02$0.00$11.02
OPERATOR: LOADER$11.59$0.00$11.59
OPERATOR: GRADER/BLADE$15.50$0.00$15.50
OPERATOR: FORKLIFT$17.38$0.00$17.38
OPERATOR: DISTRIBUTOR$11.57$0.00$11.57
OPERATOR: BULLDOZER$12.14$0.00$12.14
OPERATOR: BACKHOE/EXCAVATOR$12.56$0.00$12.56
OPERATOR: BACKHOE LOADER COMBO$17.04$0.00$17.04
OPERATOR: ASPHALT PAVER$12.07$0.00$12.07
LABORER: LANDSCAPE AND IRRIGATION$8.26$0.00$8.26
LABORER: ROOF TEAROFF$9.00$0.00$9.00
LABORER: PIPELAYER$11.79$0.00$11.79
LABORER: MASON TENDER - CEMENT/CONCRETE$10.46$0.00$10.46
LABORER: MASON TENDER - BRICK$11.51$0.00$11.51
LABORER: COMMON OR GENERAL$9.85$0.00$9.85
IRONWORKER, ORNAMENTAL$12.60$0.00$12.60
ELECTRICIAN$12.66$0.00$12.66
CEMENT MASON/CONCRETE FINISHER$15.14$0.00$15.14
CARPENTER, INCLUDES CABINET INSTALLATION$11.37$0.00$11.37
BRICKLAYER$20.00$0.00$20.00

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.