Heavy construction wages: Polk, Florida
Wage determination FL20260131 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260131 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260131/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 DRILL RIG, HORIZONTAL DIRECTIONAL DRILL OPERATOR, HORIZONTAL DIRECTION DRILL LOCATOR. JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| IRONWORKER, STRUCTURAL | $35.25 | $17.32 | $52.57 |
| LABORER: GRADE CHECKER | $22.61 | $11.59 | $34.20 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $20.21 | $12.38 | $32.59 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.21 | $1.97 | $14.18 |
| TRUCK DRIVER: LOWBOY TRUCK | $11.00 | $0.00 | $11.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.00 | $0.00 | $10.00 |
| OPERATOR: TRACTOR | $10.00 | $0.00 | $10.00 |
| OPERATOR: TRACKHOE | $20.92 | $5.50 | $26.42 |
| OPERATOR: SCRAPER | $11.00 | $1.74 | $12.74 |
| OPERATOR: ROLLER | $9.77 | $0.00 | $9.77 |
| OPERATOR: MECHANIC | $13.83 | $2.19 | $16.02 |
| OPERATOR: LOADER | $11.34 | $0.00 | $11.34 |
| OPERATOR: GRADER/BLADE | $16.00 | $2.84 | $18.84 |
| OPERATOR: CRANE | $14.88 | $3.17 | $18.05 |
| OPERATOR: BULLDOZER | $12.88 | $0.00 | $12.88 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.05 | $0.00 | $13.05 |
| OPERATOR: BACKHOE LOADER COMBO | $16.10 | $2.44 | $18.54 |
| OPERATOR: ASPHALT PAVER | $11.88 | $0.00 | $11.88 |
| MILLWRIGHT | $12.63 | $0.00 | $12.63 |
| LABORER: POWER TOOL OPERATOR (HAND HELD DRILLS/SAWS, JACKHAMMER AND POWER SAWS ONLY) | $10.63 | $2.20 | $12.83 |
| LABORER: PIPELAYER | $11.32 | $0.00 | $11.32 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $10.04 | $0.00 | $10.04 |
| FORM WORKER | $11.60 | $0.00 | $11.60 |
| ELECTRICIAN | $16.71 | $3.56 | $20.27 |
| CEMENT MASON/CONCRETE FINISHER | $13.18 | $0.00 | $13.18 |
| CARPENTER, EXCLUDES FORM WORK | $13.56 | $1.84 | $15.40 |