Residential construction wages: Bay, Florida
Wage determination FL20260054 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260054 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260054/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | $28.95 | $14.55 | $43.50 |
| POWER EQUIPMENT OPERATOR: CRANES UNDER 100 TONS CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | $30.25 | $14.55 | $44.80 |
| POWER EQUIPMENT OPERATOR: CRANES 100 TONS & OVER (CONVENTIONAL & HYDRAULIC) & TOWER CRANES CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR | $31.25 | $14.55 | $45.80 |
| IRONWORKER: ORNAMENTAL, REINFORCING, AND STRUCTURAL | $32.00 | $18.77 | $50.77 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $24.22 | $13.89 | $38.11 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $9.59 | $0.00 | $9.59 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $10.77 | $0.00 | $10.77 |
| PLUMBER | $13.53 | $0.00 | $13.53 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 |
| OPERATOR: LOADER | $13.53 | $0.00 | $13.53 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 | $13.67 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.00 | $0.00 | $13.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $10.06 | $0.00 | $10.06 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: LANDSCAPE & IRRIGATION | $9.15 | $0.00 | $9.15 |
| LABORER: COMMON OR GENERAL | $8.40 | $0.00 | $8.40 |
| ELECTRICIAN | $10.46 | $0.00 | $10.46 |
| CEMENT MASON/CONCRETE FINISHER | $10.60 | $0.00 | $10.60 |
| CARPENTER | $12.00 | $0.00 | $12.00 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |