Building construction wages: Nassau, Florida

Wage determination FL20260216 · Active · Standard · verify on SAM.gov

Nassau

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$28.00$12.30$40.30
ELEVATOR MECHANIC$51.11$38.44$89.55
OPERATOR: OILER$23.50$9.20$32.70
OPERATOR: MECHANIC$32.05$9.20$41.25
OPERATOR: FORKLIFT$23.25$9.20$32.45
OPERATOR: CRANE (ALL CRANES OVER 15 TON CAPACITY)$32.05$9.20$41.25
OPERATOR: CRANE (ALL CRANES 160 TON CAPACITY AND OVER)$33.05$9.20$42.25
IRONWORKER: ORNAMENTAL$28.90$15.66$44.56
PLUMBER$37.50$17.59$55.09
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$37.50$17.59$55.09
SPRINKLER FITTER (FIRE SPRINKLERS)$35.03$24.00$59.03
SHEET METAL WORKER: INCLUDES HVAC DUCT AND UNIT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY$31.64$15.98$47.62
TRUCK DRIVER: LOWBOY TRUCK$14.24$0.00$14.24
TRUCK DRIVER: DUMP TRUCK$13.22$2.12$15.34
TILE SETTER$18.01$0.00$18.01
ROOFER$16.99$0.00$16.99
PAINTER: BRUSH, ROLLER AND SPRAY$15.62$2.05$17.67
OPERATOR: ROLLER$14.43$4.78$19.21
OPERATOR: LOADER$14.83$1.84$16.67
OPERATOR: GRADER/BLADE$18.97$0.00$18.97
OPERATOR: BULLDOZER$15.40$1.90$17.30
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.44$1.40$15.84
LABORER: PIPELAYER$13.73$1.07$14.80
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING$13.51$0.00$13.51
IRONWORKER, STRUCTURAL$17.66$4.49$22.15
IRONWORKER, REINFORCING$22.81$11.58$34.39
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING$22.82$8.11$30.93
CEMENT MASON/CONCRETE FINISHER$17.38$0.00$17.38
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK$18.29$4.90$23.19

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.