Building construction wages: Pinellas, Florida
Wage determination FL20260222 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260222 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260222/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 | $43.23 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $33.11 | $14.59 | $47.70 |
| ELEVATOR MECHANIC | $51.83 | $38.44 | $90.27 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 | $51.86 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 |
| IRONWORKER, STRUCTURAL | $35.25 | $17.32 | $52.57 |
| IRONWORKER, REINFORCING | $35.25 | $17.32 | $52.57 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $35.30 | $18.24 | $53.54 |
| PLUMBER | $35.30 | $18.24 | $53.54 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $25.75 | $16.92 | $42.67 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 |
| TILE SETTER | $18.01 | $0.00 | $18.01 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.11 | $6.74 | $26.85 |
| ROOFER | $19.00 | $1.17 | $20.17 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.72 | $2.13 | $16.85 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $14.00 | $1.40 | $15.40 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.07 | $8.80 | $30.87 |
| LABORER: COMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.31 | $0.85 | $12.16 |
| LABORER: PIPELAYER | $14.00 | $1.40 | $15.40 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $18.00 | $2.18 | $20.18 |
| FLOOR LAYER: CARPET AND VINYL | $17.64 | $0.00 | $17.64 |
| CEMENT MASON/CONCRETE FINISHER | $13.00 | $1.30 | $14.30 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (EXCLUDES CARPET AND VINYL FLOOR LAYING) | $16.36 | $0.70 | $17.06 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.