Residential construction wages: Sarasota, Florida
Wage determination FL20260084 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260084 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260084/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $35.25 | $17.32 | $52.57 |
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY | $10.63 | $0.00 | $10.63 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $15.63 | $3.00 | $18.63 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION | $9.85 | $0.38 | $10.23 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $15.65 | $0.00 | $15.65 |
| PLUMBER, INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION | $12.43 | $0.00 | $12.43 |
| PLASTERER | $15.00 | $0.00 | $15.00 |
| PIPEFITTER | $11.25 | $0.00 | $11.25 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY | $13.09 | $0.00 | $13.09 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $14.81 | $0.00 | $14.81 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 |
| OPERATOR: LOADER | $12.17 | $0.00 | $12.17 |
| OPERATOR: GRADER/BLADE | $14.00 | $0.00 | $14.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $15.50 | $2.00 | $17.50 |
| OPERATOR: BACKHOE/EXCAVATOR | $13.75 | $0.00 | $13.75 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $12.40 | $0.00 | $12.40 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.33 | $0.00 | $11.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.33 | $0.00 | $10.33 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $8.00 | $0.00 | $8.00 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | $15.25 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $10.00 | $0.00 | $10.00 |
| FORM WORKER | $9.50 | $0.22 | $9.72 |
| ELECTRICIAN | $13.15 | $0.00 | $13.15 |
| CEMENT MASON/CONCRETE FINISHER | $17.02 | $0.00 | $17.02 |
| CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES FORM WORK) | $16.10 | $0.00 | $16.10 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.