Residential construction wages: Broward, Florida
Wage determination FL20260056 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260056 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260056/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.25 | $15.20 | $55.45 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 | $52.47 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 | $54.28 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 | $55.30 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 | $51.97 |
| OPERATOR: OILER | $27.53 | $14.90 | $42.43 |
| OPERATOR: BACKHOE | $27.00 | $14.90 | $41.90 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $28.84 | $15.72 | $44.56 |
| LABORERS: PLASTER TENDER | $22.05 | $7.27 | $29.32 |
| LABORERS: COMMON OR GENERAL | $21.55 | $7.27 | $28.82 |
| PAINTER, INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $23.84 | $14.75 | $38.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | $29.10 | $14.68 | $43.78 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 |
| TILE SETTER | $16.65 | $0.00 | $16.65 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $14.50 | $0.00 | $14.50 |
| PLUMBER | $25.00 | $1.17 | $26.17 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 |
| OPERATOR: LOADER | $16.48 | $0.00 | $16.48 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 |
| OPERATOR: EXCAVATOR | $13.50 | $0.00 | $13.50 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 | $13.67 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 | $11.79 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $13.75 | $0.00 | $13.75 |
| GLAZIER | $20.00 | $0.00 | $20.00 |
| FENCE ERECTOR | $11.00 | $0.00 | $11.00 |
| DRYWALL HANGER | $15.69 | $0.00 | $15.69 |
| DRYWALL FINISHER/TAPER | $19.22 | $0.00 | $19.22 |
| CEMENT MASON/CONCRETE FINISHER | $16.19 | $0.00 | $16.19 |
| CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING) | $21.17 | $0.86 | $22.03 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |