Building construction wages: Miami-Dade, Miami-Dade, Florida
Wage determination FL20260215 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/FL20260215 on · latest revision 1 · verify at sam.gov/wage-determination/FL20260215/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.76 | $19.02 | $58.78 |
| CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 | $35.56 |
| ELEVATOR MECHANIC | $55.85 | $38.44 | $94.29 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.00 | $14.90 | $41.90 |
| OPERATOR: CONCRETE PUMP | $32.75 | $14.90 | $47.65 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 | $52.47 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 | $54.28 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 | $55.30 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 | $51.97 |
| OPERATOR: OILER | $27.53 | $14.90 | $42.43 |
| OPERATOR: MECHANIC | $37.07 | $14.90 | $51.97 |
| OPERATOR: FORKLIFT | $26.75 | $14.90 | $41.65 |
| IRONWORKER, STRUCTURAL | $28.84 | $15.72 | $44.56 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 |
| PLUMBER | $32.98 | $14.49 | $47.47 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $43.38 | $16.70 | $60.08 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $29.10 | $14.68 | $43.78 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 |
| TILE SETTER | $18.01 | $0.00 | $18.01 |
| ROOFER | $19.98 | $4.77 | $24.75 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $3.48 | $19.48 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 |
| OPERATOR: LOADER | $16.00 | $2.82 | $18.82 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 |
| LABORER: PIPELAYER | $13.56 | $1.34 | $14.90 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $11.79 | $0.70 | $12.49 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $29.60 | $9.38 | $38.98 |
| CEMENT MASON/CONCRETE FINISHER | $13.06 | $0.70 | $13.76 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION | $18.04 | $3.24 | $21.28 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.