Miami-Dade County, Florida: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building FL20260215 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.76 | $19.02 |
| CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 |
| ELEVATOR MECHANIC | $55.85 | $38.44 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.00 | $14.90 |
| OPERATOR: CONCRETE PUMP | $32.75 | $14.90 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 |
| OPERATOR: OILER | $27.53 | $14.90 |
| OPERATOR: MECHANIC | $37.07 | $14.90 |
| OPERATOR: FORKLIFT | $26.75 | $14.90 |
| IRONWORKER, STRUCTURAL | $28.84 | $15.72 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 |
| PLUMBER | $32.98 | $14.49 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $43.38 | $16.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $29.10 | $14.68 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 |
| TILE SETTER | $18.01 | $0.00 |
| ROOFER | $19.98 | $4.77 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $3.48 |
| OPERATOR: ROLLER | $14.43 | $4.78 |
| OPERATOR: LOADER | $16.00 | $2.82 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 |
| LABORER: PIPELAYER | $13.56 | $1.34 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $11.79 | $0.70 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $29.60 | $9.38 |
| CEMENT MASON/CONCRETE FINISHER | $13.06 | $0.70 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION | $18.04 | $3.24 |
Heavy FL20260125 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| ELECTRICIAN | $40.24 | $14.94 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 |
| OPERATOR: OILER | $27.53 | $14.90 |
| OPERATOR: LOADER | $27.00 | $14.90 |
| OPERATOR: DRILL (DRILL RIG, TRUCK MOUNTED, WATSON CLASS) | $32.75 | $14.90 |
| OPERATOR: DRILL (DRILL RIG, TRUCK MOUNTED, STERLING CLASS) | $27.00 | $14.90 |
| OPERATOR: BACKHOE | $27.00 | $14.90 |
| IRONWORKER, STRUCTURAL | $28.84 | $15.72 |
| LABORER: GRADE CHECKER | $22.05 | $7.27 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $27.00 | $14.78 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.21 | $1.97 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.73 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $9.60 | $0.00 |
| OPERATOR: TRACTOR | $10.54 | $0.00 |
| OPERATOR: TRACKHOE | $20.92 | $5.50 |
| OPERATOR: SCRAPER | $11.00 | $1.74 |
| OPERATOR: ROLLER | $10.95 | $0.00 |
| OPERATOR: MECHANIC | $14.32 | $0.00 |
| OPERATOR: GRADER/BLADE | $16.00 | $2.84 |
| OPERATOR: EXCAVATOR | $21.16 | $1.67 |
| OPERATOR: BULLDOZER | $14.95 | $0.81 |
| OPERATOR: BACKHOE LOADER COMBO | $16.10 | $2.44 |
| OPERATOR: ASPHALT PAVER | $11.59 | $0.00 |
| LABORER: POWER TOOL OPERATOR (HAND HELD DRILLS/SAWS, JACKHAMMER AND POWER SAWS ONLY) | $10.63 | $2.20 |
| LABORER: LANDSCAPE | $7.25 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.09 | $1.26 |
| CEMENT MASON/CONCRETE FINISHER | $16.61 | $5.52 |
| CARPENTER, INCLUDES FORM WORK | $17.00 | $2.51 |
Highway FL20260260 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $19.02 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $18.27 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $16.55 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.36 | $2.45 |
| TRUCK DRIVER: FLATBED TRUCK | $19.46 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.53 | $0.00 |
| TRAFFIC CONTROL PERSON | $16.56 | $0.00 |
| PAINTER | $21.02 | $0.00 |
| OPERATOR: TRACTOR | $16.91 | $0.66 |
| OPERATOR: SCREED | $19.24 | $0.00 |
| OPERATOR: SCRAPER | $15.54 | $0.00 |
| OPERATOR: ROLLER | $16.61 | $0.00 |
| OPERATOR: PILEDRIVER | $22.02 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $18.55 | $0.00 |
| OPERATOR: MILLING MACHINE | $19.68 | $0.00 |
| OPERATOR: MECHANIC | $29.69 | $0.00 |
| OPERATOR: LOADER | $17.11 | $0.00 |
| OPERATOR: GRADER/BLADE | $19.25 | $0.00 |
| OPERATOR: CRANE | $36.36 | $0.00 |
| OPERATOR: BULLDOZER | $20.89 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $16.46 | $0.00 |
| OPERATOR: BOOM | $33.61 | $11.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.14 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.00 | $1.23 |
| LABORER: GRADE CHECKER | $17.21 | $0.00 |
| LABORER: PIPELAYER | $17.86 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.24 | $2.01 |
| LABORER: COMMON OR GENERAL | $15.63 | $1.05 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.65 | $0.00 |
| IRONWORKER | $24.44 | $0.00 |
| ELECTRICIAN | $34.43 | $10.84 |
| CEMENT MASON/CONCRETE FINISHER | $19.54 | $0.00 |
| CARPENTER | $19.98 | $0.00 |
Residential FL20260074 rev 1
| Classification | Rate | Fringe |
|---|---|---|
| ELECTRICIAN | $40.24 | $14.94 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 |
| OPERATOR: OILER | $27.53 | $14.90 |
| OPERATOR: BACKHOE | $27.00 | $14.90 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $28.84 | $15.72 |
| PAINTER, INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $23.84 | $14.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | $29.10 | $14.68 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 |
| TILE SETTER | $16.00 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $14.50 | $0.00 |
| PLUMBER | $25.00 | $1.17 |
| OPERATOR: TRACTOR | $10.20 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 |
| OPERATOR: ROLLER | $10.62 | $0.00 |
| OPERATOR: LOADER | $16.48 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 |
| OPERATOR: EXCAVATOR | $13.50 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 |
| LABORER: PLASTER TENDER | $10.50 | $0.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $13.75 | $0.00 |
| GLAZIER | $20.00 | $0.00 |
| FENCE ERECTOR | $17.50 | $0.00 |
| DRYWALL HANGER | $15.69 | $0.00 |
| DRYWALL FINISHER/TAPER | $19.22 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.97 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $12.51 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |