Power Equipment Operator prevailing wages: Idaho, county by county
857 current power equipment operator rates across 88 active Idaho wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Ada | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.82 | $5.88 | $26.70 | ID20260090 Highway |
| Ada | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260090 Highway |
| Ada | OPERATOR: BROOM/SWEEPER | $19.58 | $6.87 | $26.45 | ID20260090 Highway |
| Ada | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260090 Highway |
| Ada | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260090 Highway |
| Ada | OPERATOR: GRADER/BLADE | $22.36 | $6.26 | $28.62 | ID20260090 Highway |
| Ada | OPERATOR: LOADER | $23.45 | $6.62 | $30.07 | ID20260090 Highway |
| Ada | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260090 Highway |
| Ada | OPERATOR: OILER | $22.51 | $5.83 | $28.34 | ID20260090 Highway |
| Ada | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.46 | $3.86 | $24.32 | ID20260090 Highway |
| Ada | OPERATOR: ROLLER | $19.94 | $6.46 | $26.40 | ID20260090 Highway |
| Ada | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260090 Highway |
| Ada | OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 | ID20260090 Highway |
| Ada | OPERATOR: SCREED | $20.52 | $6.77 | $27.29 | ID20260090 Highway |
| Ada | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 | ID20260108 Heavy |
| Ada | POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 | ID20260108 Heavy |
| Ada | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260090 Highway |
| Ada, Boise | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $4.33 | $27.93 | ID20260104 Building |
| Ada, Boise | OPERATOR: CRANE | $31.13 | $18.35 | $49.48 | ID20260104 Building |
| Ada, Boise | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | ID20260104 Building |
| Ada, Boise | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260104 Building |
| Adams | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.02 | $9.93 | $35.95 | ID20260036 Heavy |
| Adams | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260036 Heavy |
| Adams | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260036 Heavy |
| Adams | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260036 Heavy |
| Adams | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260036 Heavy |
| Bannock | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260091 Highway |
| Bannock | OPERATOR: BROOM/SWEEPER | $24.34 | $8.04 | $32.38 | ID20260091 Highway |
| Bannock | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260091 Highway |
| Bannock | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260091 Highway |
| Bannock | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260091 Highway |
| Bannock | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $7.11 | $31.48 | ID20260091 Highway |
| Bannock | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260091 Highway |
| Bannock | OPERATOR: SCREED | $22.30 | $7.22 | $29.52 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.81 | $16.10 | $52.91 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. TRUCKS 100 FT TO 150 FT $.15 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260091 Highway |
| Bannock | POWER EQUIPMENT OPERATOR:(GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260091 Highway |
| Bannock, Franklin | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | ID20260105 Building |
| Bannock, Franklin | OPERATOR: CRANE | $31.81 | $18.12 | $49.93 | ID20260105 Building |
| Bannock, Franklin | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 | ID20260109 Heavy |
| Bannock, Franklin | POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 | ID20260109 Heavy |
| Bannock, Franklin | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | ID20260105 Building |
| Bannock, Franklin | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260105 Building |
| Bear Lake | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260037 Heavy |
| Bear Lake | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260037 Heavy |
| Bear Lake | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260037 Heavy |
| Bear Lake | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260037 Heavy |
| Bear Lake | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260037 Heavy |
| Bear Lake | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260037 Heavy |
| Bear Lake | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260037 Heavy |
| Bear Lake | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260037 Heavy |
| Bear Lake | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260037 Heavy |
| Bear Lake | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260037 Heavy |
| Bear Lake | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260037 Heavy |
| Bear Lake | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260037 Heavy |
| Bear Lake + 5 more | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260021 Building |
| Bear Lake + 5 more | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 | ID20260021 Building |
| Bear Lake + 5 more | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260021 Building |
| Bear Lake + 5 more | POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 | ID20260021 Building |
| Bear Lake + 7 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: CRANE | $26.22 | $10.00 | $36.22 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: LOADER | $26.22 | $9.98 | $36.20 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: ROLLER | $25.54 | $10.62 | $36.16 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 | ID20260087 Highway |
| Bear Lake + 7 more | OPERATOR: SCREED | $25.42 | $9.93 | $35.35 | ID20260087 Highway |
| Benewah + 3 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: CRANE | $27.18 | $10.97 | $38.15 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: LOADER | $25.76 | $10.31 | $36.07 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 | ID20260088 Highway |
| Benewah + 3 more | OPERATOR: SCREED | $25.71 | $11.55 | $37.26 | ID20260088 Highway |
| Benewah + 7 more | POWER EQUIPMENT OPERATORS: (BACKHOE) | $8.34 | $0.00 | $8.34 | ID20260003 Residential |
| Benewah + 7 more | POWER EQUIPMENT OPERATORS: FRONT END LOADER | $8.75 | $0.00 | $8.75 | ID20260003 Residential |
| Benewah + 7 more | POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT) | $8.00 | $0.00 | $8.00 | ID20260003 Residential |
| Benewah, Clearwater, Latah | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ID20260065 Heavy |
| Benewah, Clearwater, Latah | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ID20260065 Heavy |
| Bingham | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $5.80 | $26.59 | ID20260038 Heavy |
| Bingham | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.62 | $9.60 | $35.22 | ID20260073 Highway |
| Bingham | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260038 Heavy |
| Bingham | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260073 Highway |
| Bingham | OPERATOR: BROOM/SWEEPER | $24.70 | $10.76 | $35.46 | ID20260073 Highway |
| Bingham | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260073 Highway |
| Bingham | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260038 Heavy |
| Bingham | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260038 Heavy |
| Bingham | OPERATOR: CRANE | $26.22 | $10.00 | $36.22 | ID20260073 Highway |
| Bingham | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260073 Highway |
| Bingham | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260038 Heavy |
| Bingham | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260038 Heavy |
| Bingham | OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 | ID20260073 Highway |
| Bingham | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260073 Highway |
| Bingham | OPERATOR: LOADER | $26.22 | $9.98 | $36.20 | ID20260073 Highway |
| Bingham | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260038 Heavy |
| Bingham | OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 | ID20260073 Highway |
| Bingham | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260073 Highway |
| Bingham | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.59 | $9.60 | $35.19 | ID20260073 Highway |
| Bingham | OPERATOR: ROLLER | $24.94 | $10.67 | $35.61 | ID20260073 Highway |
| Bingham | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260073 Highway |
| Bingham | OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 | ID20260073 Highway |
| Bingham | OPERATOR: SCREED | $25.42 | $9.93 | $35.35 | ID20260073 Highway |
| Bingham | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260038 Heavy |
| Bingham | POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260038 Heavy |
| Bingham | POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260038 Heavy |
| Blaine | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.96 | $4.42 | $23.38 | ID20260009 Building |
| Blaine | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260039 Heavy |
| Blaine | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260074 Highway |
| Blaine | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260039 Heavy |
| Blaine | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260074 Highway |
| Blaine | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260074 Highway |
| Blaine | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260074 Highway |
| Blaine | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260039 Heavy |
| Blaine | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260009 Building |
| Blaine | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260039 Heavy |
| Blaine | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260074 Highway |
| Blaine | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260074 Highway |
| Blaine | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260039 Heavy |
| Blaine | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260039 Heavy |
| Blaine | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260074 Highway |
| Blaine | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260074 Highway |
| Blaine | OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | ID20260074 Highway |
| Blaine | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260039 Heavy |
| Blaine | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260074 Highway |
| Blaine | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.95 | $10.64 | $36.59 | ID20260074 Highway |
| Blaine | OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | ID20260074 Highway |
| Blaine | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260074 Highway |
| Blaine | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260074 Highway |
| Blaine | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260074 Highway |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260039 Heavy |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260039 Heavy |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260039 Heavy |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260074 Highway |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260039 Heavy |
| Blaine | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260039 Heavy |
| Blaine + 7 more | POWER EQUIPMENT OPERATORS: (BACKHOE) | $8.36 | $1.42 | $9.78 | ID20260006 Residential |
| Boise | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 | $26.07 | ID20260092 Highway |
| Boise | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260092 Highway |
| Boise | OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 | $27.54 | ID20260092 Highway |
| Boise | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260092 Highway |
| Boise | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260092 Highway |
| Boise | OPERATOR: GRADER/BLADE | $22.33 | $5.71 | $28.04 | ID20260092 Highway |
| Boise | OPERATOR: LOADER | $22.79 | $5.86 | $28.65 | ID20260092 Highway |
| Boise | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260092 Highway |
| Boise | OPERATOR: OILER | $21.47 | $5.40 | $26.87 | ID20260092 Highway |
| Boise | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.18 | $3.86 | $24.04 | ID20260092 Highway |
| Boise | OPERATOR: ROLLER | $18.82 | $3.86 | $22.68 | ID20260092 Highway |
| Boise | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260092 Highway |
| Boise | OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 | ID20260092 Highway |
| Boise | OPERATOR: SCREED | $19.26 | $4.55 | $23.81 | ID20260092 Highway |
| Boise | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260092 Highway |
| Boise + 3 more | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 | ID20260110 Heavy |
| Boise + 3 more | POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 | ID20260110 Heavy |
| Bonner | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260010 Building |
| Bonner | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260040 Heavy |
| Bonner | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260075 Highway |
| Bonner | OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 | ID20260075 Highway |
| Bonner | OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 | ID20260075 Highway |
| Bonner | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260040 Heavy |
| Bonner | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260010 Building |
| Bonner | OPERATOR: CRANE | $27.18 | $10.97 | $38.15 | ID20260075 Highway |
| Bonner | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260075 Highway |
| Bonner | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260040 Heavy |
| Bonner | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260075 Highway |
| Bonner | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260075 Highway |
| Bonner | OPERATOR: LOADER | $25.76 | $10.31 | $36.07 | ID20260075 Highway |
| Bonner | OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 | ID20260075 Highway |
| Bonner | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260075 Highway |
| Bonner | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | ID20260075 Highway |
| Bonner | OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 | ID20260075 Highway |
| Bonner | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260075 Highway |
| Bonner | OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 | ID20260075 Highway |
| Bonner | OPERATOR: SCREED | $25.71 | $11.55 | $37.26 | ID20260075 Highway |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE/EXCAVATOR/TRACKHOE (45,000 GW & UNDER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.76 | $15.95 | $44.71 | ID20260075 Highway |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE/EXCAVATOR/TRACKHOE (45,000-110,000 GW) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $29.04 | $15.95 | $44.99 | ID20260075 Highway |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ID20260040 Heavy |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE (OVER 110,000 GW) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $29.31 | $15.95 | $45.26 | ID20260075 Highway |
| Bonner | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ID20260040 Heavy |
| Bonneville | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | ID20260100 Building |
| Bonneville | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260093 Highway |
| Bonneville | OPERATOR: BROOM/SWEEPER | $24.10 | $8.66 | $32.76 | ID20260093 Highway |
| Bonneville | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260093 Highway |
| Bonneville | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260093 Highway |
| Bonneville | OPERATOR: GRADER/BLADE | $25.85 | $9.60 | $35.45 | ID20260093 Highway |
| Bonneville | OPERATOR: LOADER | $24.94 | $8.95 | $33.89 | ID20260093 Highway |
| Bonneville | OPERATOR: MECHANIC | $25.82 | $9.75 | $35.57 | ID20260093 Highway |
| Bonneville | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260093 Highway |
| Bonneville | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.61 | $8.23 | $32.84 | ID20260093 Highway |
| Bonneville | OPERATOR: ROLLER | $24.59 | $8.95 | $33.54 | ID20260093 Highway |
| Bonneville | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260093 Highway |
| Bonneville | OPERATOR: ROTOMILL | $25.42 | $10.25 | $35.67 | ID20260093 Highway |
| Bonneville | OPERATOR: SCREED | $22.30 | $7.22 | $29.52 | ID20260093 Highway |
| Bonneville | POWER EQUIPMENT OPERATOR: CRANE | $36.14 | $16.10 | $52.24 | ID20260100 Building |
| Bonneville | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.14 | $16.10 | $52.24 | ID20260100 Building |
| Bonneville | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260093 Highway |
| Bonneville | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260100 Building |
| Bonneville, Butte, Jefferson | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 | ID20260111 Heavy |
| Bonneville, Butte, Jefferson | POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 | ID20260111 Heavy |
| Boundary | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260011 Building |
| Boundary | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260041 Heavy |
| Boundary | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260041 Heavy |
| Boundary | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260011 Building |
| Boundary | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ID20260041 Heavy |
| Boundary | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ID20260041 Heavy |
| Butte | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 | ID20260076 Highway |
| Butte | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | ID20260101 Building |
| Butte | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260076 Highway |
| Butte | OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 | ID20260076 Highway |
| Butte | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260076 Highway |
| Butte | OPERATOR: CRANE | $26.22 | $10.00 | $36.22 | ID20260076 Highway |
| Butte | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260076 Highway |
| Butte | OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 | ID20260076 Highway |
| Butte | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260076 Highway |
| Butte | OPERATOR: LOADER | $26.22 | $9.98 | $36.20 | ID20260076 Highway |
| Butte | OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 | ID20260076 Highway |
| Butte | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260076 Highway |
| Butte | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 | ID20260076 Highway |
| Butte | OPERATOR: ROLLER | $25.54 | $10.62 | $36.16 | ID20260076 Highway |
| Butte | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260076 Highway |
| Butte | OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 | ID20260076 Highway |
| Butte | OPERATOR: SCREED | $25.42 | $9.93 | $35.35 | ID20260076 Highway |
| Butte | POWER EQUIPMENT OPERATOR: CRANE | $36.14 | $16.10 | $52.24 | ID20260101 Building |
| Butte | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.14 | $16.10 | $52.24 | ID20260101 Building |
| Butte | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260101 Building |
| Camas | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260043 Heavy |
| Camas | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260043 Heavy |
| Camas | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260043 Heavy |
| Camas | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260043 Heavy |
| Camas | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260043 Heavy |
| Camas | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260043 Heavy |
| Camas | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260043 Heavy |
| Camas | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260043 Heavy |
| Camas | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260043 Heavy |
| Camas | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260043 Heavy |
| Camas | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260043 Heavy |
| Camas | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260043 Heavy |
| Camas | TREATMENT PLANTS: OPERATOR: EXCAVATOR | $20.24 | $0.00 | $20.24 | ID20260043 Heavy |
| Camas + 4 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.96 | $4.42 | $23.38 | ID20260022 Building |
| Camas + 4 more | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260022 Building |
| Camas, Gooding, Lincoln | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260089 Highway |
| Camas, Gooding, Lincoln | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260089 Highway |
| Camas, Gooding, Lincoln | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260089 Highway |
| Canyon | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 | $26.07 | ID20260094 Highway |
| Canyon | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260094 Highway |
| Canyon | OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 | $27.54 | ID20260094 Highway |
| Canyon | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260094 Highway |
| Canyon | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260094 Highway |
| Canyon | OPERATOR: GRADER/BLADE | $22.33 | $5.71 | $28.04 | ID20260094 Highway |
| Canyon | OPERATOR: LOADER | $21.13 | $4.42 | $25.55 | ID20260094 Highway |
| Canyon | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260094 Highway |
| Canyon | OPERATOR: OILER | $21.47 | $5.40 | $26.87 | ID20260094 Highway |
| Canyon | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.85 | $3.86 | $20.71 | ID20260094 Highway |
| Canyon | OPERATOR: ROLLER | $18.82 | $3.86 | $22.68 | ID20260094 Highway |
| Canyon | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260094 Highway |
| Canyon | OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 | ID20260094 Highway |
| Canyon | OPERATOR: SCREED | $19.26 | $4.55 | $23.81 | ID20260094 Highway |
| Canyon | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260094 Highway |
| Canyon, Gem | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $4.33 | $27.93 | ID20260106 Building |
| Canyon, Gem | OPERATOR: CRANE | $31.13 | $18.35 | $49.48 | ID20260106 Building |
| Canyon, Gem | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | ID20260106 Building |
| Canyon, Gem | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260106 Building |
| Caribou | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.15 | $6.14 | $27.29 | ID20260044 Heavy |
| Caribou | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260044 Heavy |
| Caribou | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260044 Heavy |
| Caribou | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260044 Heavy |
| Caribou | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260044 Heavy |
| Caribou | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260044 Heavy |
| Caribou | OPERATOR: LOADER (FRONT END) | $21.33 | $4.25 | $25.58 | ID20260044 Heavy |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260044 Heavy |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260013 Building |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260044 Heavy |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 | ID20260013 Building |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260013 Building |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260044 Heavy |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 | ID20260013 Building |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260044 Heavy |
| Caribou | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260044 Heavy |
| Cassia | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260045 Heavy |
| Cassia | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260077 Highway |
| Cassia | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260045 Heavy |
| Cassia | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260077 Highway |
| Cassia | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260077 Highway |
| Cassia | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260077 Highway |
| Cassia | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260045 Heavy |
| Cassia | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260045 Heavy |
| Cassia | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260077 Highway |
| Cassia | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260077 Highway |
| Cassia | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260045 Heavy |
| Cassia | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260045 Heavy |
| Cassia | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260077 Highway |
| Cassia | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260077 Highway |
| Cassia | OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | ID20260077 Highway |
| Cassia | OPERATOR: LOADER (FRONT END) | $21.33 | $4.25 | $25.58 | ID20260045 Heavy |
| Cassia | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260077 Highway |
| Cassia | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | ID20260077 Highway |
| Cassia | OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | ID20260077 Highway |
| Cassia | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260077 Highway |
| Cassia | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260077 Highway |
| Cassia | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260077 Highway |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260045 Heavy |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260045 Heavy |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260045 Heavy |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260077 Highway |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260045 Heavy |
| Cassia | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260045 Heavy |
| Clark | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260046 Heavy |
| Clark | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260046 Heavy |
| Clark | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260046 Heavy |
| Clark | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260046 Heavy |
| Clark | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260046 Heavy |
| Clark | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260046 Heavy |
| Clark | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260046 Heavy |
| Clark | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260046 Heavy |
| Clark | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260046 Heavy |
| Clark | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260046 Heavy |
| Clark | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260046 Heavy |
| Clark | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260046 Heavy |
| Clark, Custer | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260023 Building |
| Clark, Custer | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 | ID20260023 Building |
| Clark, Custer | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260023 Building |
| Clark, Custer | POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 | ID20260023 Building |
| Clearwater | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260014 Building |
| Clearwater | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260014 Building |
| Custer | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260047 Heavy |
| Custer | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 | ID20260078 Highway |
| Custer | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260047 Heavy |
| Custer | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260078 Highway |
| Custer | OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 | ID20260078 Highway |
| Custer | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260078 Highway |
| Custer | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260047 Heavy |
| Custer | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260047 Heavy |
| Custer | OPERATOR: CRANE | $26.22 | $10.00 | $36.22 | ID20260078 Highway |
| Custer | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260078 Highway |
| Custer | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260047 Heavy |
| Custer | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260047 Heavy |
| Custer | OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 | ID20260078 Highway |
| Custer | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260078 Highway |
| Custer | OPERATOR: LOADER | $26.22 | $9.98 | $36.20 | ID20260078 Highway |
| Custer | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260047 Heavy |
| Custer | OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 | ID20260078 Highway |
| Custer | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260078 Highway |
| Custer | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.10 | $10.64 | $36.74 | ID20260078 Highway |
| Custer | OPERATOR: ROLLER | $25.68 | $10.00 | $35.68 | ID20260078 Highway |
| Custer | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260078 Highway |
| Custer | OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 | ID20260078 Highway |
| Custer | OPERATOR: SCREED | $25.42 | $9.93 | $35.35 | ID20260078 Highway |
| Custer | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260047 Heavy |
| Custer | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260047 Heavy |
| Custer | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260047 Heavy |
| Custer | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260047 Heavy |
| Custer | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260047 Heavy |
| Elmore | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.58 | $0.00 | $21.58 | ID20260048 Heavy |
| Elmore | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.20 | $9.97 | $36.17 | ID20260079 Highway |
| Elmore | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260048 Heavy |
| Elmore | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260079 Highway |
| Elmore | OPERATOR: BROOM/SWEEPER | $23.93 | $9.09 | $33.02 | ID20260079 Highway |
| Elmore | OPERATOR: BULLDOZER | $25.94 | $10.36 | $36.30 | ID20260079 Highway |
| Elmore | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260048 Heavy |
| Elmore | OPERATOR: CRANE | $26.04 | $10.28 | $36.32 | ID20260079 Highway |
| Elmore | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260079 Highway |
| Elmore | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260048 Heavy |
| Elmore | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260079 Highway |
| Elmore | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260079 Highway |
| Elmore | OPERATOR: LOADER | $26.11 | $10.00 | $36.11 | ID20260079 Highway |
| Elmore | OPERATOR: MECHANIC | $25.40 | $8.63 | $34.03 | ID20260079 Highway |
| Elmore | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260079 Highway |
| Elmore | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.63 | $10.33 | $35.96 | ID20260079 Highway |
| Elmore | OPERATOR: ROLLER | $25.24 | $10.42 | $35.66 | ID20260079 Highway |
| Elmore | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260079 Highway |
| Elmore | OPERATOR: ROTOMILL | $27.06 | $12.65 | $39.71 | ID20260079 Highway |
| Elmore | OPERATOR: SCREED | $24.07 | $9.63 | $33.70 | ID20260079 Highway |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260048 Heavy |
| Elmore | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260048 Heavy |
| Elmore + 4 more | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260020 Building |
| Elmore + 4 more | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260020 Building |
| Franklin, Power | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260098 Highway |
| Franklin, Power | OPERATOR: BROOM/SWEEPER | $22.80 | $7.47 | $30.27 | ID20260098 Highway |
| Franklin, Power | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260098 Highway |
| Franklin, Power | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260098 Highway |
| Franklin, Power | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260098 Highway |
| Franklin, Power | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.24 | $7.12 | $31.36 | ID20260098 Highway |
| Franklin, Power | OPERATOR: ROLLER | $24.26 | $8.14 | $32.40 | ID20260098 Highway |
| Franklin, Power | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260098 Highway |
| Franklin, Power | OPERATOR: SCREED | $22.30 | $7.22 | $29.52 | ID20260098 Highway |
| Franklin, Power | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260098 Highway |
| Franklin, Power | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.81 | $16.10 | $52.91 | ID20260098 Highway |
| Franklin, Power | POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. TRUCKS 100 FT TO 150 FT $.15 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260098 Highway |
| Franklin, Power | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260098 Highway |
| Franklin, Power | POWER EQUIPMENT OPERATOR:(GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260098 Highway |
| Fremont | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260049 Heavy |
| Fremont | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260049 Heavy |
| Fremont | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260049 Heavy |
| Fremont | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260049 Heavy |
| Fremont | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260049 Heavy |
| Fremont | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260049 Heavy |
| Fremont | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260049 Heavy |
| Fremont | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260049 Heavy |
| Fremont | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260049 Heavy |
| Fremont | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260049 Heavy |
| Fremont | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260049 Heavy |
| Fremont | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260049 Heavy |
| Gem, Owyhee | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 | $26.07 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 | $27.54 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: GRADER/BLADE | $22.33 | $5.71 | $28.04 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: LOADER | $22.79 | $5.86 | $28.65 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: OILER | $21.47 | $5.40 | $26.87 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.18 | $3.86 | $24.04 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: ROLLER | $18.82 | $3.86 | $22.68 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 | ID20260099 Highway |
| Gem, Owyhee | OPERATOR: SCREED | $19.26 | $4.55 | $23.81 | ID20260099 Highway |
| Gem, Owyhee | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260099 Highway |
| Gooding | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260050 Heavy |
| Gooding | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260050 Heavy |
| Gooding | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260050 Heavy |
| Gooding | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260050 Heavy |
| Gooding | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260050 Heavy |
| Gooding | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260050 Heavy |
| Gooding | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260050 Heavy |
| Gooding | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260050 Heavy |
| Gooding | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260050 Heavy |
| Gooding | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260050 Heavy |
| Gooding | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260050 Heavy |
| Gooding | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260050 Heavy |
| Idaho | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 | ID20260080 Highway |
| Idaho | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260051 Heavy |
| Idaho | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260080 Highway |
| Idaho | OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 | ID20260080 Highway |
| Idaho | OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 | ID20260080 Highway |
| Idaho | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260051 Heavy |
| Idaho | OPERATOR: CRANE | $26.04 | $10.28 | $36.32 | ID20260080 Highway |
| Idaho | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260080 Highway |
| Idaho | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260051 Heavy |
| Idaho | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260080 Highway |
| Idaho | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260080 Highway |
| Idaho | OPERATOR: LOADER | $25.76 | $10.31 | $36.07 | ID20260080 Highway |
| Idaho | OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 | ID20260080 Highway |
| Idaho | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260080 Highway |
| Idaho | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | ID20260080 Highway |
| Idaho | OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 | ID20260080 Highway |
| Idaho | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260080 Highway |
| Idaho | OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 | ID20260080 Highway |
| Idaho | OPERATOR: SCREED | $25.71 | $11.55 | $37.26 | ID20260080 Highway |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $35.80 | $15.95 | $51.75 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $36.33 | $15.95 | $52.28 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $36.64 | $15.95 | $52.59 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $36.81 | $15.95 | $52.76 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $36.81 | $16.10 | $52.91 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $36.98 | $15.95 | $52.93 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, BACKHOE (3/4 YDS- 31/2 YDS), CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), PAVER, SCRAPER (UP TO AND INCLUDING 40 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $37.35 | $15.95 | $53.30 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 7 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260051 Heavy |
| Idaho | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $37.58 | $15.95 | $53.53 | ID20260051 Heavy |
| Idaho, Lewis | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260024 Building |
| Idaho, Lewis | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260024 Building |
| Jefferson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | ID20260102 Building |
| Jefferson | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | ID20260095 Highway |
| Jefferson | OPERATOR: BROOM/SWEEPER | $24.10 | $8.66 | $32.76 | ID20260095 Highway |
| Jefferson | OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | ID20260095 Highway |
| Jefferson | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260095 Highway |
| Jefferson | OPERATOR: GRADER/BLADE | $25.85 | $9.60 | $35.45 | ID20260095 Highway |
| Jefferson | OPERATOR: LOADER | $24.94 | $8.95 | $33.89 | ID20260095 Highway |
| Jefferson | OPERATOR: MECHANIC | $25.82 | $9.75 | $35.57 | ID20260095 Highway |
| Jefferson | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260095 Highway |
| Jefferson | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.61 | $8.23 | $32.84 | ID20260095 Highway |
| Jefferson | OPERATOR: ROLLER | $24.86 | $10.13 | $34.99 | ID20260095 Highway |
| Jefferson | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260095 Highway |
| Jefferson | OPERATOR: ROTOMILL | $25.42 | $10.25 | $35.67 | ID20260095 Highway |
| Jefferson | OPERATOR: SCREED | $22.30 | $7.22 | $29.52 | ID20260095 Highway |
| Jefferson | POWER EQUIPMENT OPERATOR: CRANE | $36.14 | $16.10 | $52.24 | ID20260102 Building |
| Jefferson | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.14 | $16.10 | $52.24 | ID20260102 Building |
| Jefferson | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260095 Highway |
| Jefferson | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260102 Building |
| Jerome | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260052 Heavy |
| Jerome | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260081 Highway |
| Jerome | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260052 Heavy |
| Jerome | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260081 Highway |
| Jerome | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260081 Highway |
| Jerome | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260081 Highway |
| Jerome | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260052 Heavy |
| Jerome | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260052 Heavy |
| Jerome | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260081 Highway |
| Jerome | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260081 Highway |
| Jerome | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260052 Heavy |
| Jerome | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260052 Heavy |
| Jerome | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260081 Highway |
| Jerome | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260081 Highway |
| Jerome | OPERATOR: LOADER | $25.59 | $10.03 | $35.62 | ID20260081 Highway |
| Jerome | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260052 Heavy |
| Jerome | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260081 Highway |
| Jerome | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.93 | $10.05 | $35.98 | ID20260081 Highway |
| Jerome | OPERATOR: ROLLER | $25.52 | $10.11 | $35.63 | ID20260081 Highway |
| Jerome | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260081 Highway |
| Jerome | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260081 Highway |
| Jerome | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260081 Highway |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260052 Heavy |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260052 Heavy |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260052 Heavy |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260081 Highway |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260052 Heavy |
| Jerome | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260052 Heavy |
| Kootenai | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.88 | $11.62 | $37.50 | ID20260096 Highway |
| Kootenai | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 | $36.73 | ID20260096 Highway |
| Kootenai | OPERATOR: BROOM/SWEEPER | $23.34 | $8.48 | $31.82 | ID20260096 Highway |
| Kootenai | OPERATOR: CRANE | $23.53 | $9.55 | $33.08 | ID20260096 Highway |
| Kootenai | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260096 Highway |
| Kootenai | OPERATOR: GRADER/BLADE | $26.06 | $11.64 | $37.70 | ID20260096 Highway |
| Kootenai | OPERATOR: LOADER | $26.06 | $11.76 | $37.82 | ID20260096 Highway |
| Kootenai | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260096 Highway |
| Kootenai | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260096 Highway |
| Kootenai | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.78 | $11.50 | $37.28 | ID20260096 Highway |
| Kootenai | OPERATOR: ROLLER | $25.12 | $11.76 | $36.88 | ID20260096 Highway |
| Kootenai | OPERATOR: ROLLER (FINISHING) | $25.77 | $11.64 | $37.41 | ID20260096 Highway |
| Kootenai | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260096 Highway |
| Kootenai | OPERATOR: SCREED | $26.06 | $11.56 | $37.62 | ID20260096 Highway |
| Kootenai | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ID20260096 Highway |
| Kootenai, Nez Perce | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | ID20260107 Building |
| Kootenai, Nez Perce | OPERATOR: CRANE | $31.13 | $18.35 | $49.48 | ID20260107 Building |
| Kootenai, Nez Perce | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 | ID20260112 Heavy |
| Kootenai, Nez Perce | POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 | ID20260112 Heavy |
| Kootenai, Nez Perce | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | ID20260107 Building |
| Kootenai, Nez Perce | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260107 Building |
| Latah | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260015 Building |
| Latah | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 | ID20260082 Highway |
| Latah | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260082 Highway |
| Latah | OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 | ID20260082 Highway |
| Latah | OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 | ID20260082 Highway |
| Latah | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260015 Building |
| Latah | OPERATOR: CRANE | $27.18 | $10.97 | $38.15 | ID20260082 Highway |
| Latah | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260082 Highway |
| Latah | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260082 Highway |
| Latah | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260082 Highway |
| Latah | OPERATOR: LOADER | $25.76 | $10.31 | $36.07 | ID20260082 Highway |
| Latah | OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 | ID20260082 Highway |
| Latah | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260082 Highway |
| Latah | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | ID20260082 Highway |
| Latah | OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 | ID20260082 Highway |
| Latah | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260082 Highway |
| Latah | OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 | ID20260082 Highway |
| Latah | OPERATOR: SCREED | $25.71 | $11.55 | $37.26 | ID20260082 Highway |
| Lemhi | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260053 Heavy |
| Lemhi | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260053 Heavy |
| Lemhi | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260053 Heavy |
| Lemhi | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260053 Heavy |
| Lemhi | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260053 Heavy |
| Lemhi | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260053 Heavy |
| Lemhi | OPERATOR: LOADER (FRONT END) | $21.33 | $4.25 | $25.58 | ID20260053 Heavy |
| Lemhi | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260053 Heavy |
| Lemhi | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260053 Heavy |
| Lemhi | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260053 Heavy |
| Lemhi | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260053 Heavy |
| Lemhi | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260053 Heavy |
| Lewis | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260054 Heavy |
| Lewis | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260054 Heavy |
| Lewis | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ID20260054 Heavy |
| Lewis | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ID20260054 Heavy |
| Lincoln | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 | ID20260055 Heavy |
| Lincoln | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260055 Heavy |
| Lincoln | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260055 Heavy |
| Lincoln | OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260055 Heavy |
| Lincoln | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260055 Heavy |
| Lincoln | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260055 Heavy |
| Lincoln | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260055 Heavy |
| Lincoln | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260055 Heavy |
| Lincoln | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260055 Heavy |
| Lincoln | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260055 Heavy |
| Lincoln | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260055 Heavy |
| Lincoln | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260055 Heavy |
| Madison | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260056 Heavy |
| Madison | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260056 Heavy |
| Madison | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260056 Heavy |
| Madison | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260056 Heavy |
| Madison | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260056 Heavy |
| Madison | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260056 Heavy |
| Madison | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260056 Heavy |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260056 Heavy |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260016 Building |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260056 Heavy |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 | ID20260016 Building |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260016 Building |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260056 Heavy |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 | ID20260016 Building |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260056 Heavy |
| Madison | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260056 Heavy |
| Minidoka | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.96 | $4.42 | $23.38 | ID20260017 Building |
| Minidoka | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.39 | $2.85 | $20.24 | ID20260057 Heavy |
| Minidoka | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260083 Highway |
| Minidoka | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260057 Heavy |
| Minidoka | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260083 Highway |
| Minidoka | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260083 Highway |
| Minidoka | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260083 Highway |
| Minidoka | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260057 Heavy |
| Minidoka | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260017 Building |
| Minidoka | OPERATOR: CRANE | $26.00 | $9.53 | $35.53 | ID20260057 Heavy |
| Minidoka | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260083 Highway |
| Minidoka | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260083 Highway |
| Minidoka | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260057 Heavy |
| Minidoka | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260057 Heavy |
| Minidoka | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260083 Highway |
| Minidoka | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260083 Highway |
| Minidoka | OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | ID20260083 Highway |
| Minidoka | OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 | ID20260057 Heavy |
| Minidoka | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260083 Highway |
| Minidoka | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | ID20260083 Highway |
| Minidoka | OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | ID20260083 Highway |
| Minidoka | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260083 Highway |
| Minidoka | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260083 Highway |
| Minidoka | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260083 Highway |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260057 Heavy |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260057 Heavy |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260057 Heavy |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260083 Highway |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260057 Heavy |
| Minidoka | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260057 Heavy |
| Minidoka | TREATMENT PLANTS: OPERATOR: CRANE | $27.59 | $9.60 | $37.19 | ID20260057 Heavy |
| Nez Perce | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.60 | $11.61 | $37.21 | ID20260097 Highway |
| Nez Perce | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 | $36.73 | ID20260097 Highway |
| Nez Perce | OPERATOR: BROOM/SWEEPER | $23.34 | $8.48 | $31.82 | ID20260097 Highway |
| Nez Perce | OPERATOR: CRANE | $23.53 | $9.55 | $33.08 | ID20260097 Highway |
| Nez Perce | OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | ID20260097 Highway |
| Nez Perce | OPERATOR: GRADER/BLADE | $26.06 | $11.66 | $37.72 | ID20260097 Highway |
| Nez Perce | OPERATOR: LOADER | $26.06 | $11.74 | $37.80 | ID20260097 Highway |
| Nez Perce | OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | ID20260097 Highway |
| Nez Perce | OPERATOR: OILER | $22.25 | $6.52 | $28.77 | ID20260097 Highway |
| Nez Perce | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.80 | $11.56 | $37.36 | ID20260097 Highway |
| Nez Perce | OPERATOR: ROLLER | $25.04 | $11.68 | $36.72 | ID20260097 Highway |
| Nez Perce | OPERATOR: ROLLER (FINISHING) | $25.77 | $11.72 | $37.49 | ID20260097 Highway |
| Nez Perce | OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | ID20260097 Highway |
| Nez Perce | OPERATOR: SCREED | $25.89 | $11.70 | $37.59 | ID20260097 Highway |
| Nez Perce | POWER EQUIPMENT OPERATOR: GROUP 6 BULLDOZER ZONE PAY: ZONE 1 0 - 45 MILES: FREE ZONE 2 45 MILES AND OVER: +$2.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: SPOKANE PASCO LEWISTON | $40.05 | $23.40 | $63.45 | ID20260097 Highway |
| Oneida | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260058 Heavy |
| Oneida | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260058 Heavy |
| Oneida | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260058 Heavy |
| Oneida | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260058 Heavy |
| Oneida | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260058 Heavy |
| Oneida | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260058 Heavy |
| Oneida | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260058 Heavy |
| Oneida | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260058 Heavy |
| Oneida | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260058 Heavy |
| Oneida | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260058 Heavy |
| Oneida | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260058 Heavy |
| Oneida | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260058 Heavy |
| Owyhee | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $4.33 | $27.93 | ID20260103 Building |
| Owyhee | OPERATOR: CRANE | $31.13 | $18.35 | $49.48 | ID20260103 Building |
| Owyhee | POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | ID20260103 Building |
| Owyhee | POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | ID20260103 Building |
| Payette | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.00 | $0.00 | $17.00 | ID20260059 Heavy |
| Payette | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260059 Heavy |
| Payette | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260059 Heavy |
| Payette | OPERATOR: EXCAVATOR | $17.00 | $0.00 | $17.00 | ID20260059 Heavy |
| Payette | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260059 Heavy |
| Payette | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260059 Heavy |
| Payette + 3 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.20 | $9.97 | $36.17 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: BROOM/SWEEPER | $23.93 | $9.09 | $33.02 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: BULLDOZER | $25.94 | $10.36 | $36.30 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: CRANE | $26.04 | $10.28 | $36.32 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: LOADER | $25.15 | $9.83 | $34.98 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: MECHANIC | $25.40 | $8.63 | $34.03 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.63 | $10.33 | $35.96 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: ROLLER | $25.24 | $10.42 | $35.66 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: ROTOMILL | $27.06 | $12.65 | $39.71 | ID20260086 Highway |
| Payette + 3 more | OPERATOR: SCREED | $24.07 | $9.63 | $33.70 | ID20260086 Highway |
| Power | OPERATOR: BACKHOE/EXCAVATOR | $22.23 | $0.00 | $22.23 | ID20260034 Building |
| Power | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.28 | $0.00 | $16.28 | ID20260034 Building |
| Power | OPERATOR: BULLDOZER | $24.52 | $7.87 | $32.39 | ID20260034 Building |
| Power | OPERATOR: LOADER (FRONT END) | $21.27 | $5.54 | $26.81 | ID20260034 Building |
| Power | POWER EQUIPMENT OPERATOR: BLADE OPERATOR, BACKHOE 3/4 YD-3 1/2 YD), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260072 Heavy |
| Power | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260072 Heavy |
| Power | POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ID20260034 Building |
| Power | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260072 Heavy |
| Power | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260072 Heavy |
| Power | POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260034 Building |
| Power | POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260034 Building |
| Power | POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260072 Heavy |
| Power | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260072 Heavy |
| Shoshone | OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 | ID20260018 Building |
| Shoshone | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 | ID20260084 Highway |
| Shoshone | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260060 Heavy |
| Shoshone | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260084 Highway |
| Shoshone | OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 | ID20260084 Highway |
| Shoshone | OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 | ID20260084 Highway |
| Shoshone | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260060 Heavy |
| Shoshone | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260018 Building |
| Shoshone | OPERATOR: CRANE | $27.18 | $10.97 | $38.15 | ID20260084 Highway |
| Shoshone | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260084 Highway |
| Shoshone | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260060 Heavy |
| Shoshone | OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | ID20260084 Highway |
| Shoshone | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260084 Highway |
| Shoshone | OPERATOR: LOADER | $25.76 | $10.31 | $36.07 | ID20260084 Highway |
| Shoshone | OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 | ID20260084 Highway |
| Shoshone | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260084 Highway |
| Shoshone | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | ID20260084 Highway |
| Shoshone | OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 | ID20260084 Highway |
| Shoshone | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260084 Highway |
| Shoshone | OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 | ID20260084 Highway |
| Shoshone | OPERATOR: SCREED | $25.71 | $11.55 | $37.26 | ID20260084 Highway |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ID20260060 Heavy |
| Shoshone | POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ID20260060 Heavy |
| Teton | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | ID20260061 Heavy |
| Teton | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | ID20260061 Heavy |
| Teton | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260061 Heavy |
| Teton | OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | ID20260061 Heavy |
| Teton | OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | ID20260061 Heavy |
| Teton | OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | ID20260061 Heavy |
| Teton | OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | ID20260061 Heavy |
| Teton | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260061 Heavy |
| Teton | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260061 Heavy |
| Teton | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ID20260061 Heavy |
| Teton | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260061 Heavy |
| Teton | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260061 Heavy |
| Twin Falls | OPERATOR: BACKHOE/EXCAVATOR | $18.96 | $4.42 | $23.38 | ID20260019 Building |
| Twin Falls | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.24 | $0.00 | $21.24 | ID20260062 Heavy |
| Twin Falls | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | ID20260085 Highway |
| Twin Falls | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 | ID20260062 Heavy |
| Twin Falls | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | ID20260085 Highway |
| Twin Falls | OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | ID20260085 Highway |
| Twin Falls | OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | ID20260085 Highway |
| Twin Falls | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260062 Heavy |
| Twin Falls | OPERATOR: CRANE | $27.29 | $10.53 | $37.82 | ID20260019 Building |
| Twin Falls | OPERATOR: CRANE | $25.96 | $9.60 | $35.56 | ID20260062 Heavy |
| Twin Falls | OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | ID20260085 Highway |
| Twin Falls | OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | ID20260085 Highway |
| Twin Falls | OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 | ID20260062 Heavy |
| Twin Falls | OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 | ID20260062 Heavy |
| Twin Falls | OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | ID20260085 Highway |
| Twin Falls | OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | ID20260085 Highway |
| Twin Falls | OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | ID20260085 Highway |
| Twin Falls | OPERATOR: LOADER (FRONT END) | $21.33 | $3.43 | $24.76 | ID20260062 Heavy |
| Twin Falls | OPERATOR: OILER | $25.66 | $9.23 | $34.89 | ID20260085 Highway |
| Twin Falls | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | ID20260085 Highway |
| Twin Falls | OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | ID20260085 Highway |
| Twin Falls | OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | ID20260085 Highway |
| Twin Falls | OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | ID20260085 Highway |
| Twin Falls | OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | ID20260085 Highway |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260062 Heavy |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260062 Heavy |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | ID20260062 Heavy |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ID20260085 Highway |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260062 Heavy |
| Twin Falls | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260062 Heavy |
| Valley | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.44 | $8.95 | $35.39 | ID20260063 Heavy |
| Valley | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260063 Heavy |
| Valley | OPERATOR: BULLDOZER | $26.44 | $8.95 | $35.39 | ID20260063 Heavy |
| Valley | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260063 Heavy |
| Valley | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $27.35 | $16.10 | $43.45 | ID20260063 Heavy |
| Valley | POWER EQUIPMENT OPERATOR: GROUP 8 SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ID20260063 Heavy |
| Washington | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.15 | $10.03 | $32.18 | ID20260064 Heavy |
| Washington | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | ID20260064 Heavy |
| Washington | OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | ID20260064 Heavy |
| Washington | OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ID20260064 Heavy |
| Washington | POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ID20260064 Heavy |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Idaho trades.