Building construction wages: Boundary, Idaho
Wage determination ID20260011 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260011 on · latest revision 1 · verify at sam.gov/wage-determination/ID20260011/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $47.67 | $28.38 | $76.05 |
| BRICKLAYER | $32.05 | $18.27 | $50.32 |
| CARPENTER (INCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING)) | $38.87 | $17.84 | $56.71 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
| ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $67.61 | $38.44 | $106.05 |
| LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 |
| LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 | $39.19 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| PLUMBER (ZONE 1) | $44.57 | $26.58 | $71.15 |
| ROOFER | $35.75 | $15.21 | $50.96 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 | $61.42 |
| TRUCK DRIVER: DUMP TRUCK | $17.82 | $2.18 | $20.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $19.31 | $4.41 | $23.72 |
| OPERATOR: CRANE | $27.29 | $10.53 | $37.82 |
| OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 |
| LABORER: CARPENTER TENDER | $17.71 | $1.82 | $19.53 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 |
| DRYWALL FINISHER/TAPER | $20.27 | $3.50 | $23.77 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING ONLY) | $24.69 | $1.62 | $26.31 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.