Highway construction wages: Bonneville, Idaho
Wage determination ID20260093 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260093 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/ID20260093/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| TRUCK DRIVER: WATER TRUCK | $21.35 | $13.05 | $34.40 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $21.17 | $12.10 | $33.27 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.69 | $4.66 | $22.35 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.48 | $33.16 |
| OPERATOR: SCREED | $22.30 | $7.22 | $29.52 |
| OPERATOR: ROTOMILL | $25.42 | $10.25 | $35.67 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER | $24.59 | $8.95 | $33.54 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.61 | $8.23 | $32.84 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 |
| OPERATOR: MECHANIC | $25.82 | $9.75 | $35.57 |
| OPERATOR: LOADER | $24.94 | $8.95 | $33.89 |
| OPERATOR: GRADER/BLADE | $25.85 | $9.60 | $35.45 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 |
| OPERATOR: BROOM/SWEEPER | $24.10 | $8.66 | $32.76 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.34 | $10.90 | $33.24 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 |
| LABORER: COMMON OR GENERAL | $22.84 | $10.83 | $33.67 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.38 | $7.86 | $27.24 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.33 | $11.45 | $37.78 |
| CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 | $34.89 |
| CARPENTER, EXCLUDES FORM WORK | $25.21 | $9.32 | $34.53 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |