Butte County, Idaho: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Bidding a job in Butte County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.
Building ID20260101 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $35.53 | $19.85 | $55.38 |
| CARPENTER | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.14 | $16.10 | $52.24 |
| IRONWORKER | $35.19 | $23.46 | $58.65 |
| LABORER: GRADE CHECKER | $33.98 | $13.80 | $47.78 |
| LABORER: COMMON OR GENERAL | $33.63 | $13.80 | $47.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $33.93 | $13.80 | $47.73 |
| ROOFER | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER | $35.50 | $22.25 | $57.75 |
| TRUCK DRIVER: DUMP TRUCK | $25.06 | $8.81 | $33.87 |
| PAINTER | $17.11 | $1.25 | $18.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 |
| CEMENT MASON/CONCRETE FINISHER | $22.21 | $3.80 | $26.01 |
Heavy ID20260111 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $42.25 | $18.84 | $61.09 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 |
| IRONWORKER | $43.40 | $30.27 | $73.67 |
| LABORER (COMMON OR GENERAL) | $34.25 | $13.80 | $48.05 |
| CARPENTER | $24.00 | $2.62 | $26.62 |
| TRUCK DRIVER: DUMP TRUCK | $35.60 | $17.00 | $52.60 |
Highway ID20260076 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.96 | $34.49 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.66 | $13.04 | $34.70 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $24.80 | $6.91 | $31.71 |
| ELECTRICIAN | $25.00 | $10.93 | $35.93 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 |
| TRUCK DRIVER, GROUP 3 WATER TRUCK | $35.60 | $17.00 | $52.60 |
LABORER 6 classifications · $33.58 to $50.33 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 3 ASPHALT RAKER | $33.63 | $16.50 | $50.13 |
| LABORER: GROUP 1 ASPHALT LABORER INCLUDING SHOVELING, SPREADING, AND DISTRIBUTING | $33.83 | $16.50 | $50.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.42 | $10.90 | $34.32 |
| LABORER: GRADE CHECKER | $23.52 | $11.05 | $34.57 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $22.68 | $10.90 | $33.58 |
OPERATOR 16 classifications · $30.81 to $37.13 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: SCREED | $25.42 | $9.93 | $35.35 |
| OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.54 | $10.62 | $36.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 |
| OPERATOR: LOADER | $26.22 | $9.98 | $36.20 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $26.22 | $10.00 | $36.22 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 |
| OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 |
Residential ID20260004 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $8.00 | $0.00 | $8.00 |
| PLUMBER | $11.25 | $0.00 | $11.25 |
| PAINTER | $7.25 | $0.00 | $7.25 |
| LABORER | $7.25 | $0.00 | $7.25 |
| FLOOR LAYER: CARPET | $10.50 | $0.00 | $10.50 |
| ELECTRICIAN | $8.00 | $0.00 | $8.00 |
| CARPENTER | $7.25 | $0.00 | $7.25 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.