Highway construction wages: Butte, Idaho
Wage determination ID20260076 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260076 on · latest revision 1 · verify at sam.gov/wage-determination/ID20260076/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 3 ASPHALT RAKER | $33.63 | $16.50 | $50.13 |
| LABORER: GROUP 1 ASPHALT LABORER INCLUDING SHOVELING, SPREADING, AND DISTRIBUTING | $33.83 | $16.50 | $50.33 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.96 | $34.49 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.66 | $13.04 | $34.70 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 |
| OPERATOR: SCREED | $25.42 | $9.93 | $35.35 |
| OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.54 | $10.62 | $36.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 |
| OPERATOR: LOADER | $26.22 | $9.98 | $36.20 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $26.22 | $10.00 | $36.22 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 |
| OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.42 | $10.90 | $34.32 |
| LABORER: GRADE CHECKER | $23.52 | $11.05 | $34.57 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $22.68 | $10.90 | $33.58 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $24.80 | $6.91 | $31.71 |
| ELECTRICIAN | $25.00 | $10.93 | $35.93 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 |
| TRUCK DRIVER, GROUP 3 WATER TRUCK | $35.60 | $17.00 | $52.60 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.