Heavy construction wages: Bingham, Idaho
Wage determination ID20260038 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260038 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/ID20260038/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: EXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 |
| WATER & SEWER LINES: OPERATOR - EXCAVATOR | $22.07 | $0.00 | $22.07 |
| TRUCK DRIVER: WATER TRUCK | $24.57 | $11.22 | $35.79 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| TRUCK DRIVER: DUMP TRUCK | $17.53 | $0.00 | $17.53 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 |
| OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 |
| OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 |
| OPERATOR: CRANE | $24.30 | $8.38 | $32.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $5.80 | $26.59 |
| LABORER: PIPELAYER | $18.23 | $3.77 | $22.00 |
| LABORER: COMMON OR GENERAL | $20.43 | $10.90 | $31.33 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 |
| CEMENT MASON/CONCRETE FINISHER | $18.02 | $0.00 | $18.02 |
| CARPENTER (FORM WORK ONLY) | $25.27 | $9.10 | $34.37 |