| POWER EQUIPMENT OPERATOR: GROUP 6 BULLDOZER ZONE PAY: ZONE 1 0 - 45 MILES: FREE ZONE 2 45 MILES AND OVER: +$2.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: SPOKANE PASCO LEWISTON | $40.05 | $23.40 | $63.45 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $23.15 | $11.77 | $34.92 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $23.46 | $12.12 | $35.58 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $21.64 | $9.40 | $31.04 |
| TRAFFIC CONTROL: FLAGGER | $20.76 | $9.40 | $30.16 |
| OPERATOR: SCREED | $25.89 | $11.70 | $37.59 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER (FINISHING) | $25.77 | $11.72 | $37.49 |
| OPERATOR: ROLLER | $25.04 | $11.68 | $36.72 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.80 | $11.56 | $37.36 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 |
| OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 |
| OPERATOR: LOADER | $26.06 | $11.74 | $37.80 |
| OPERATOR: GRADER/BLADE | $26.06 | $11.66 | $37.72 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.53 | $9.55 | $33.08 |
| OPERATOR: BROOM/SWEEPER | $23.34 | $8.48 | $31.82 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 | $36.73 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.60 | $11.61 | $37.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.36 | $10.14 | $33.50 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 |
| LABORER: COMMON OR GENERAL | $22.86 | $10.32 | $33.18 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.40 | $9.72 | $33.12 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.97 | $12.10 | $39.07 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 | $33.67 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |