Highway construction wages: Nez Perce, Idaho
Wage determination ID20260097 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260097 on · latest revision 2 · verify at sam.gov/wage-determination/ID20260097/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 6 BULLDOZER ZONE PAY: ZONE 1 0 - 45 MILES: FREE ZONE 2 45 MILES AND OVER: +$2.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: SPOKANE PASCO LEWISTON | $40.05 | $23.40 | $63.45 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $23.15 | $11.77 | $34.92 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $23.46 | $12.12 | $35.58 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $21.64 | $9.40 | $31.04 |
| TRAFFIC CONTROL: FLAGGER | $20.76 | $9.40 | $30.16 |
| OPERATOR: SCREED | $25.89 | $11.70 | $37.59 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER (FINISHING) | $25.77 | $11.72 | $37.49 |
| OPERATOR: ROLLER | $25.04 | $11.68 | $36.72 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.80 | $11.56 | $37.36 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 |
| OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 |
| OPERATOR: LOADER | $26.06 | $11.74 | $37.80 |
| OPERATOR: GRADER/BLADE | $26.06 | $11.66 | $37.72 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.53 | $9.55 | $33.08 |
| OPERATOR: BROOM/SWEEPER | $23.34 | $8.48 | $31.82 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 | $36.73 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.60 | $11.61 | $37.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.36 | $10.14 | $33.50 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 |
| LABORER: COMMON OR GENERAL | $22.86 | $10.32 | $33.18 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.40 | $9.72 | $33.12 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.97 | $12.10 | $39.07 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 | $33.67 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.