Fremont County, Idaho: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building ID20260021 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.79 | $17.34 | $44.13 |
| CARPENTER ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 1 COMMON OR GENERAL | $32.62 | $16.50 | $49.12 |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE | $33.93 | $16.50 | $50.43 |
| LABORER: GROUP 1 COMMON OR GENERAL | $32.62 | $16.50 | $49.12 |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE | $33.93 | $16.50 | $50.43 |
| PLUMBER | $36.75 | $18.93 | $55.68 |
| ROOFER | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $35.50 | $22.25 | $57.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $26.80 | $12.00 | $38.80 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.12 | $0.00 | $16.12 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 |
| CEMENT MASON/CONCRETE FINISHER | $14.76 | $2.80 | $17.56 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 |
Heavy ID20260049 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: EXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 |
| TRUCK DRIVER: WATER TRUCK | $24.57 | $11.22 | $35.79 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| TRUCK DRIVER: DUMP TRUCK | $17.53 | $0.00 | $17.53 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 |
| OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 |
| OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 |
| OPERATOR: CRANE | $24.30 | $8.38 | $32.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 |
| LABORER: PIPELAYER | $18.23 | $3.77 | $22.00 |
| LABORER: COMMON OR GENERAL | $20.26 | $10.15 | $30.41 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 |
| CEMENT MASON/CONCRETE FINISHER | $18.02 | $0.00 | $18.02 |
| CARPENTER (FORM WORK ONLY) | $25.27 | $9.10 | $34.37 |
Highway ID20260087 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $21.35 | $13.33 | $34.68 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.96 | $34.49 |
| TRUCK DRIVER: DUMP TRUCK | $21.86 | $13.18 | $35.04 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.66 | $13.04 | $34.70 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 |
| OPERATOR: SCREED | $25.42 | $9.93 | $35.35 |
| OPERATOR: ROTOMILL | $25.84 | $10.63 | $36.47 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.54 | $10.62 | $36.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: MECHANIC | $26.91 | $10.22 | $37.13 |
| OPERATOR: LOADER | $26.22 | $9.98 | $36.20 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $25.96 | $10.00 | $35.96 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $26.22 | $10.00 | $36.22 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 |
| OPERATOR: BROOM/SWEEPER | $24.95 | $10.18 | $35.13 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.74 | $10.07 | $35.81 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.42 | $10.90 | $34.32 |
| LABORER: GRADE CHECKER | $23.52 | $11.05 | $34.57 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $22.68 | $10.90 | $33.58 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.37 | $10.50 | $33.87 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $24.80 | $6.91 | $31.71 |
| ELECTRICIAN | $25.00 | $10.93 | $35.93 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
Residential ID20260004 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $8.00 | $0.00 | $8.00 |
| PLUMBER | $11.25 | $0.00 | $11.25 |
| PAINTER | $7.25 | $0.00 | $7.25 |
| LABORER | $7.25 | $0.00 | $7.25 |
| FLOOR LAYER: CARPET | $10.50 | $0.00 | $10.50 |
| ELECTRICIAN | $8.00 | $0.00 | $8.00 |
| CARPENTER | $7.25 | $0.00 | $7.25 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.