Jefferson County, Idaho: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building ID20260102 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $35.53 | $19.85 | $55.38 |
| CARPENTER | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.14 | $16.10 | $52.24 |
| IRONWORKER | $35.19 | $23.46 | $58.65 |
| LABORER: GRADE CHECKER | $33.98 | $13.80 | $47.78 |
| LABORER: COMMON OR GENERAL | $33.63 | $13.80 | $47.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $33.93 | $13.80 | $47.73 |
| ROOFER | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER | $35.50 | $22.25 | $57.75 |
| TRUCK DRIVER: DUMP TRUCK | $25.06 | $8.81 | $33.87 |
| PAINTER | $17.11 | $1.25 | $18.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 |
| CEMENT MASON/CONCRETE FINISHER | $22.21 | $3.80 | $26.01 |
Heavy ID20260111 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $42.25 | $18.84 | $61.09 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.98 | $20.50 | $57.48 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.14 | $16.10 | $52.24 |
| IRONWORKER | $43.40 | $30.27 | $73.67 |
| LABORER (COMMON OR GENERAL) | $34.25 | $13.80 | $48.05 |
| CARPENTER | $24.00 | $2.62 | $26.62 |
| TRUCK DRIVER: DUMP TRUCK | $35.60 | $17.00 | $52.60 |
Highway ID20260095 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| TRUCK DRIVER: WATER TRUCK | $21.35 | $13.05 | $34.40 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $21.35 | $12.59 | $33.94 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.69 | $4.66 | $22.35 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.70 | $33.38 |
| OPERATOR: SCREED | $22.30 | $7.22 | $29.52 |
| OPERATOR: ROTOMILL | $25.42 | $10.25 | $35.67 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER | $24.86 | $10.13 | $34.99 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.61 | $8.23 | $32.84 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 |
| OPERATOR: MECHANIC | $25.82 | $9.75 | $35.57 |
| OPERATOR: LOADER | $24.94 | $8.95 | $33.89 |
| OPERATOR: GRADER/BLADE | $25.85 | $9.60 | $35.45 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 |
| OPERATOR: BROOM/SWEEPER | $24.10 | $8.66 | $32.76 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.34 | $10.90 | $33.24 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 |
| LABORER: COMMON OR GENERAL | $23.19 | $11.00 | $34.19 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.38 | $7.86 | $27.24 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.33 | $11.45 | $37.78 |
| CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 | $34.89 |
| CARPENTER, EXCLUDES FORM WORK | $25.21 | $9.32 | $34.53 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |
Residential ID20260004 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $8.00 | $0.00 | $8.00 |
| PLUMBER | $11.25 | $0.00 | $11.25 |
| PAINTER | $7.25 | $0.00 | $7.25 |
| LABORER | $7.25 | $0.00 | $7.25 |
| FLOOR LAYER: CARPET | $10.50 | $0.00 | $10.50 |
| ELECTRICIAN | $8.00 | $0.00 | $8.00 |
| CARPENTER | $7.25 | $0.00 | $7.25 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.