Building construction wages: Power, Idaho
Wage determination ID20260034 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260034 on · latest revision 2 · verify at sam.gov/wage-determination/ID20260034/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.79 | $17.34 | $44.13 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 4 MASON TENDER (CEMENT/CONCRETE & BRICK ) | $33.93 | $16.50 | $50.43 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $12.09 | $5.33 | $17.42 |
| PLUMBER | $36.75 | $18.93 | $55.68 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $35.50 | $22.25 | $57.75 |
| TRUCK DRIVER: DUMP TRUCK | $16.06 | $0.00 | $16.06 |
| ROOFER | $19.00 | $0.00 | $19.00 |
| OPERATOR: LOADER (FRONT END) | $21.27 | $5.54 | $26.81 |
| OPERATOR: BULLDOZER | $24.52 | $7.87 | $32.39 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.28 | $0.00 | $16.28 |
| OPERATOR: BACKHOE/EXCAVATOR | $22.23 | $0.00 | $22.23 |
| LABORER: COMMON OR GENERAL | $17.87 | $0.00 | $17.87 |
| IRONWORKER, REINFORCING | $24.74 | $14.82 | $39.56 |
| CEMENT MASON/CONCRETE FINISHER | $13.52 | $2.80 | $16.32 |
| CARPENTER | $18.00 | $0.00 | $18.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.