Building ID20260034 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.79 | $17.34 | $44.13 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 4 MASON TENDER (CEMENT/CONCRETE & BRICK ) | $33.93 | $16.50 | $50.43 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $12.09 | $5.33 | $17.42 |
| PLUMBER | $36.75 | $18.93 | $55.68 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $35.50 | $22.25 | $57.75 |
| TRUCK DRIVER: DUMP TRUCK | $16.06 | $0.00 | $16.06 |
| ROOFER | $19.00 | $0.00 | $19.00 |
| OPERATOR: LOADER (FRONT END) | $21.27 | $5.54 | $26.81 |
| OPERATOR: BULLDOZER | $24.52 | $7.87 | $32.39 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.28 | $0.00 | $16.28 |
| OPERATOR: BACKHOE/EXCAVATOR | $22.23 | $0.00 | $22.23 |
| LABORER: COMMON OR GENERAL | $17.87 | $0.00 | $17.87 |
| IRONWORKER, REINFORCING | $24.74 | $14.82 | $39.56 |
| CEMENT MASON/CONCRETE FINISHER | $13.52 | $2.80 | $16.32 |
| CARPENTER | $18.00 | $0.00 | $18.00 |
Heavy ID20260072 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 |
| POWER EQUIPMENT OPERATOR: BLADE OPERATOR, BACKHOE 3/4 YD-3 1/2 YD), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 |
| LABORER: GENERAL OR COMMON ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 |
| TRUCK DRIVER: WATER TRUCK | $21.00 | $13.42 | $34.42 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.15 | $10.15 | $32.30 |
| LABORER: GRADE CHECKER | $22.68 | $10.90 | $33.58 |
| CEMENT MASON/CONCRETE FINISHER | $22.43 | $15.06 | $37.49 |
| CARPENTER, EXCLUDES FORM WORK | $26.06 | $11.26 | $37.32 |
| CARPENTER (FORM WORK ONLY) | $23.92 | $9.03 | $32.95 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 |
Highway ID20260098 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:(GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. TRUCKS 100 FT TO 150 FT $.15 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.81 | $16.10 | $52.91 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| TRUCK DRIVER: WATER TRUCK | $21.54 | $12.19 | $33.73 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $21.50 | $10.91 | $32.41 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.69 | $4.66 | $22.35 |
| OPERATOR: SCREED | $22.30 | $7.22 | $29.52 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER | $24.26 | $8.14 | $32.40 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.24 | $7.12 | $31.36 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 |
| OPERATOR: BROOM/SWEEPER | $22.80 | $7.47 | $30.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.34 | $10.90 | $33.24 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 |
| LABORER: COMMON OR GENERAL | $19.18 | $7.65 | $26.83 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.38 | $7.65 | $27.03 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.33 | $11.45 | $37.78 |
| CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 | $34.89 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.84 | $33.76 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |
Residential ID20260005 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $8.86 | $0.00 | $8.86 |
| SHEET METAL WORKER | $10.47 | $1.79 | $12.26 |
| ROOFER | $9.40 | $1.00 | $10.40 |
| PLUMBER | $9.86 | $0.00 | $9.86 |
| PAINTER | $8.81 | $0.00 | $8.81 |
| LABORER | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $9.65 | $0.00 | $9.65 |
| CEMENT MASON/CONCRETE FINISHER | $9.53 | $0.00 | $9.53 |
| CARPENTER | $7.25 | $0.00 | $7.25 |
| BRICKLAYER | $10.25 | $1.00 | $11.25 |