Highway construction wages: Boise, Idaho
Wage determination ID20260092 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260092 on · latest revision 1 · verify at sam.gov/wage-determination/ID20260092/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| TRUCK DRIVER: WATER TRUCK | $18.72 | $9.30 | $28.02 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 |
| TRUCK DRIVER: DUMP TRUCK | $21.30 | $0.00 | $21.30 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $16.17 | $4.66 | $20.83 |
| TRAFFIC CONTROL: FLAGGER | $14.02 | $4.66 | $18.68 |
| OPERATOR: SCREED | $19.26 | $4.55 | $23.81 |
| OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 |
| OPERATOR: ROLLER | $18.82 | $3.86 | $22.68 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.18 | $3.86 | $24.04 |
| OPERATOR: OILER | $21.47 | $5.40 | $26.87 |
| OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 |
| OPERATOR: LOADER | $22.79 | $5.86 | $28.65 |
| OPERATOR: GRADER/BLADE | $22.33 | $5.71 | $28.04 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 |
| OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 | $27.54 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 | $26.07 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.50 | $5.41 | $20.91 |
| LABORER: GRADE CHECKER | $15.95 | $3.86 | $19.81 |
| LABORER: COMMON OR GENERAL | $15.83 | $4.66 | $20.49 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.57 | $8.61 | $30.18 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 |
| ELECTRICIAN | $26.97 | $12.10 | $39.07 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $5.41 | $21.41 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 | $33.67 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.