Gooding County, Idaho: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building ID20260022 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $30.00 | $17.78 | $47.78 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER:MASON TENDER-CEMENT/CONCRETE | $33.93 | $16.50 | $50.43 |
| PLUMBER | $39.90 | $18.67 | $58.57 |
| ROOFER | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $39.20 | $23.59 | $62.79 |
| TRUCK DRIVER: DUMP TRUCK | $17.82 | $2.18 | $20.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.12 | $0.00 | $16.12 |
| OPERATOR: CRANE | $27.29 | $10.53 | $37.82 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.96 | $4.42 | $23.38 |
| LABORER: TAMPER (HAND HELD) | $15.00 | $5.00 | $20.00 |
| LABORER: PIPELAYER | $14.26 | $0.00 | $14.26 |
| LABORER: COMMON OR GENERAL | $14.82 | $0.00 | $14.82 |
| HVAC MECHANIC: DUCT INSTALLATION | $23.63 | $6.63 | $30.26 |
| CEMENT MASON/CONCRETE FINISHER | $14.76 | $2.80 | $17.56 |
| CARPENTER | $21.44 | $0.00 | $21.44 |
| TRUCK DRIVER: GROUP 3 WATER TRUCK | $35.00 | $17.00 | $52.00 |
Heavy ID20260050 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 |
| TRUCK DRIVER: WATER TRUCK | $23.89 | $9.52 | $33.41 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| TRUCK DRIVER: DUMP TRUCK | $18.84 | $0.00 | $18.84 |
| PAINTER | $16.88 | $0.00 | $16.88 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: LOADER (FRONT END) | $18.91 | $0.00 | $18.91 |
| OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 |
| OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 |
| OPERATOR: CRANE | $27.59 | $9.60 | $37.19 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 |
| LABORER: PIPELAYER | $16.39 | $0.00 | $16.39 |
| LABORER: COMMON OR GENERAL | $21.08 | $9.94 | $31.02 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $5.67 | $22.83 |
| CARPENTER, EXCLUDES FORM WORK | $28.00 | $0.00 | $28.00 |
| CARPENTER (FORM WORK ONLY) | $25.27 | $9.10 | $34.37 |
Highway ID20260089 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $21.61 | $13.05 | $34.66 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.98 | $34.51 |
| TRUCK DRIVER: DUMP TRUCK | $21.19 | $13.30 | $34.49 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.35 | $13.05 | $34.40 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 |
| OPERATOR: SCREED | $25.63 | $10.34 | $35.97 |
| OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: LOADER | $25.78 | $10.17 | $35.95 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $26.04 | $10.00 | $36.04 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 |
| OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.69 | $10.97 | $34.66 |
| LABORER: GRADE CHECKER | $23.45 | $10.97 | $34.42 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $23.35 | $10.91 | $34.26 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.13 | $11.01 | $34.14 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $26.38 | $7.89 | $34.27 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
Residential ID20260006 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $8.36 | $1.42 | $9.78 |
| PLUMBER | $12.92 | $0.00 | $12.92 |
| LABORER | $7.25 | $1.02 | $8.27 |
| INSULATION MECHANIC | $9.99 | $0.00 | $9.99 |
| ELECTRICIAN | $9.45 | $0.00 | $9.45 |
| CEMENT MASON/CONCRETE FINISHER | $7.25 | $1.20 | $8.45 |
| CARPENTER | $9.09 | $0.00 | $9.09 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.