Building construction wages: Kootenai, Nez Perce, Idaho
Wage determination ID20260107 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $32.27 | $21.57 | $53.84 |
| TRUCK DRIVER: DUMP TRUCK | $25.06 | $8.81 | $33.87 |
| ROOFER | $19.80 | $2.06 | $21.86 |
| PAINTER | $17.11 | $1.25 | $18.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 |
| CEMENT MASON/CONCRETE FINISHER | $22.21 | $3.80 | $26.01 |
| OPERATOR: CRANE | $31.13 | $18.35 | $49.48 |
| BRICKLAYER | $35.53 | $19.85 | $55.38 |
| CARPENTER | $44.98 | $17.84 | $62.82 |
| ELECTRICIAN | $48.55 | $19.09 | $67.64 |
| POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 |
| IRONWORKER | $43.40 | $30.27 | $73.67 |
| LABORER: GRADE CHECKER | $33.98 | $13.80 | $47.78 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $33.93 | $13.80 | $47.73 |
| LABORER (COMMON OR GENERAL) | $29.44 | $14.50 | $43.94 |