Clearwater County, Idaho: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building ID20260014 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR | $20.75 | $4.42 | $25.17 |
| BOILERMAKER | $47.67 | $28.38 | $76.05 |
| BRICKLAYER | $32.05 | $18.27 | $50.32 |
| CARPENTER (INCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING)) | $33.41 | $17.84 | $51.25 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
| ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $67.61 | $38.44 | $106.05 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 |
| LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 |
| LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 | $39.19 |
| PLUMBER (ZONE 1) | $44.57 | $26.58 | $71.15 |
| ROOFER | $35.75 | $15.21 | $50.96 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 | $61.42 |
| TRUCK DRIVER: DUMP TRUCK | $17.82 | $2.18 | $20.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $19.31 | $4.41 | $23.72 |
| OPERATOR: CRANE | $27.29 | $10.53 | $37.82 |
| LABORER: CARPENTER TENDER | $17.71 | $1.82 | $19.53 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 |
| DRYWALL FINISHER/TAPER | $20.27 | $3.50 | $23.77 |
| CEMENT MASON/CONCRETE FINISHER | $26.08 | $9.93 | $36.01 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING ONLY) | $24.69 | $1.62 | $26.31 |
Heavy ID20260065 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $38.87 | $17.84 | $56.71 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 |
| LABORER (PIPELINE ONLY): COMMON | $26.28 | $12.15 | $38.43 |
| LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 | $38.84 |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| PLUMBER (ZONE 1) | $37.71 | $23.44 | $61.15 |
| TRUCK DRIVER: WATER TRUCK | $24.48 | $11.67 | $36.15 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 |
| LABORER: PIPELAYER | $17.67 | $7.26 | $24.93 |
| LABORER: LANDSCAPE | $22.13 | $11.13 | $33.26 |
| LABORER: COMMON OR GENERAL | $23.75 | $8.98 | $32.73 |
| CARPENTER, EXCLUDES FORM WORK | $29.92 | $5.20 | $35.12 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | $37.02 | $20.93 | $57.95 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | $36.58 | $20.93 | $57.51 |
Highway ID20260088 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER (CEMENT/CONCRETE) | $28.21 | $13.00 | $41.21 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $23.12 | $10.75 | $33.87 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $22.12 | $13.20 | $35.32 |
| TRUCK DRIVER: DUMP TRUCK | $23.40 | $10.75 | $34.15 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $21.46 | $10.12 | $31.58 |
| OPERATOR: SCREED | $25.71 | $11.55 | $37.26 |
| OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 |
| OPERATOR: LOADER | $25.76 | $10.31 | $36.07 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $27.18 | $10.97 | $38.15 |
| OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 |
| OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 |
| LABORER: GRADE CHECKER | $23.41 | $10.78 | $34.19 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $22.92 | $10.01 | $32.93 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $22.86 | $9.40 | $32.26 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $23.80 | $6.67 | $30.47 |
| ELECTRICIAN | $26.83 | $11.94 | $38.77 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
Residential ID20260003 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $10.33 | $0.00 | $10.33 |
| SHEET METAL WORKER | $10.00 | $1.10 | $11.10 |
| ROOFER | $10.00 | $0.00 | $10.00 |
| POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT) | $8.00 | $0.00 | $8.00 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $8.75 | $0.00 | $8.75 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $8.34 | $0.00 | $8.34 |
| PLUMBER | $8.50 | $0.00 | $8.50 |
| PAINTER | $8.00 | $0.00 | $8.00 |
| LABORER | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $9.18 | $0.00 | $9.18 |
| CARPENTER | $8.30 | $0.00 | $8.30 |
| BRICKLAYER | $11.86 | $0.00 | $11.86 |