Building construction wages: Bannock, Franklin, Idaho
Wage determination ID20260105 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260105 on · latest revision 3 · verify at sam.gov/wage-determination/ID20260105/3
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 3 | 2026-05-18 | diff vs rev 2 |
| rev 2 | 2026-05-17 | diff vs rev 1 |
| rev 1 | 2026-01-30 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $35.53 | $19.85 | $55.38 |
| CARPENTER | $35.68 | $18.24 | $53.92 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 |
| IRONWORKER | $33.37 | $22.98 | $56.35 |
| LABORER: GRADE CHECKER | $33.98 | $13.80 | $47.78 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $33.93 | $13.80 | $47.73 |
| LABORER (COMMON OR GENERAL) | $33.63 | $16.50 | $50.13 |
| ROOFER | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $35.50 | $22.52 | $58.02 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $35.50 | $22.52 | $58.02 |
| TRUCK DRIVER: DUMP TRUCK | $25.06 | $8.81 | $33.87 |
| PAINTER | $17.11 | $1.25 | $18.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 |
| CEMENT MASON/CONCRETE FINISHER | $22.21 | $3.80 | $26.01 |
| OPERATOR: CRANE | $31.81 | $18.12 | $49.93 |