Washington County, Idaho: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Building ID20260020 rev 1

ClassificationRateFringeTotal
BRICKLAYER$30.00$17.78$47.78
ELECTRICIAN$42.25$18.84$61.09
IRONWORKER: STRUCTURAL (ADAMS AND WASHINGTON COUNTIES)$43.40$30.27$73.67
IRONWORKER: STRUCTURAL (ELMORE, PAYETTE, AND VALLEY COUNTIES)$30.62$21.48$52.10
LABORER:MASON TENDER-CEMENT/CONCRETE$33.93$16.50$50.43
PLUMBER$39.90$18.67$58.57
ROOFER$35.75$15.21$50.96
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$39.20$23.59$62.79
TRUCK DRIVER: DUMP TRUCK$17.82$2.18$20.00
PAINTER: BRUSH, ROLLER AND SPRAY$16.12$0.00$16.12
OPERATOR: CRANE$27.29$10.53$37.82
OPERATOR: BACKHOE/EXCAVATOR$20.75$4.42$25.17
LABORER: COMMON OR GENERAL$15.44$0.00$15.44
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$20.13$1.80$21.93
CEMENT MASON/CONCRETE FINISHER$19.43$5.88$25.31
CARPENTER$23.68$7.53$31.21

Heavy ID20260064 rev 1

ClassificationRateFringeTotal
ELECTRICIAN$42.25$18.84$61.09
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE$37.58$16.10$53.68
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE$37.35$16.10$53.45
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE$36.98$16.10$53.08
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.81$16.10$52.91
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.64$16.10$52.74
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.33$16.10$52.43
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$38.06$16.10$54.16
IRONWORKER, STRUCTURAL$43.40$30.27$73.67
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR$33.83$16.50$50.33
LABORER: GROUP 1 FLAGGER$33.63$16.50$50.13
TRUCK DRIVER: WATER TRUCK$24.70$12.10$36.80
TRUCK DRIVER: LOWBOY TRUCK$21.00$12.10$33.10
OPERATOR: CONCRETE BATCH PLANT$24.94$11.96$36.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$22.15$10.03$32.18
OPERATOR: FORKLIFT$21.20$0.00$21.20
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.97$0.00$20.97
LABORER: PIPELAYER$17.67$7.26$24.93
LABORER: COMMON OR GENERAL$22.46$10.00$32.46
IRONWORKER, REINFORCING$27.22$16.70$43.92
CEMENT MASON/CONCRETE FINISHER$23.25$12.31$35.56
CARPENTER, INCLUDES FORM WORK$25.41$9.98$35.39
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS)$37.19$17.00$54.19
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS)$36.75$17.00$53.75
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS)$36.12$17.00$53.12
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS)$36.01$17.00$53.01
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS)$35.78$17.00$52.78
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS)$35.60$17.00$52.60

Highway ID20260086 rev 1

ClassificationRateFringeTotal
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53
TRUCK DRIVER: WATER TRUCK$23.99$11.12$35.11
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK$22.54$12.35$34.89
TRUCK DRIVER: LOWBOY TRUCK$22.12$13.20$35.32
TRUCK DRIVER: DUMP TRUCK$21.80$13.95$35.75
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$22.66$10.90$33.56
OPERATOR: SCREED$24.07$9.63$33.70
OPERATOR: ROTOMILL$27.06$12.65$39.71
OPERATOR: ROLLER (SUBGRADE)$22.24$8.57$30.81
OPERATOR: ROLLER$25.24$10.42$35.66
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$25.63$10.33$35.96
OPERATOR: OILER$25.66$9.23$34.89
OPERATOR: MECHANIC$25.40$8.63$34.03
OPERATOR: LOADER$25.15$9.83$34.98
OPERATOR: HYDROSEEDER$24.76$11.51$36.27
OPERATOR: GRADER/BLADE$26.00$10.30$36.30
OPERATOR: CRUSHER$25.06$9.23$34.29
OPERATOR: CRANE$26.04$10.28$36.32
OPERATOR: BULLDOZER$25.94$10.36$36.30
OPERATOR: BROOM/SWEEPER$23.93$9.09$33.02
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.35$11.55$36.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$26.20$9.97$36.17
LABORER: MASON TENDER - CEMENT/CONCRETE$23.88$11.05$34.93
LABORER: GRADE CHECKER$23.41$10.78$34.19
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$23.98$11.05$35.03
LABORER: COMMON OR GENERAL$23.88$11.05$34.93
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$23.09$10.44$33.53
HIGHWAY/PARKING LOT STRIPING: PAINTER$23.80$6.67$30.47
ELECTRICIAN$26.83$11.94$38.77
CARPENTER (FORM WORK ONLY)$26.57$8.10$34.67

Residential ID20260001 rev 1

ClassificationRateFringeTotal
TRUCK DRIVER$7.25$0.00$7.25
SHEET METAL WORKER$8.00$0.34$8.34
ROOFER$8.00$0.00$8.00
PLUMBER$10.82$0.00$10.82
PLASTERER$9.00$0.00$9.00
PAINTER$8.03$0.00$8.03
LABORER$7.25$0.00$7.25
IRONWORKER$8.25$0.75$9.00
INSULATION INSTALLER$7.25$0.00$7.25
ELECTRICIAN$8.72$0.00$8.72
CEMENT MASON/CONCRETE FINISHER$7.81$0.00$7.81
CARPENTER$9.07$0.00$9.07

Get an email when rates change here

One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.