Wage determination ID20260064 · Active · Standard · verify on SAM.gov

Washington

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 rate change (ELECTRICIAN $42.25 → $42.25).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ELECTRICIAN$42.25$18.84$61.09
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE$37.58$16.10$53.68
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT - $.45 OVER SCALE$37.35$16.10$53.45
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE$36.98$16.10$53.08
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.81$16.10$52.91
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.64$16.10$52.74
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.33$16.10$52.43
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$38.06$16.10$54.16
IRONWORKER, STRUCTURAL$43.40$30.27$73.67
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR$33.83$16.50$50.33
LABORER: GROUP 1 FLAGGER$33.63$16.50$50.13
TRUCK DRIVER: WATER TRUCK$24.70$12.10$36.80
TRUCK DRIVER: LOWBOY TRUCK$21.00$12.10$33.10
OPERATOR: CONCRETE BATCH PLANT$24.94$11.96$36.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$22.15$10.03$32.18
OPERATOR: FORKLIFT$21.20$0.00$21.20
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.97$0.00$20.97
LABORER: PIPELAYER$17.67$7.26$24.93
LABORER: COMMON OR GENERAL$22.46$10.00$32.46
IRONWORKER, REINFORCING$27.22$16.70$43.92
CEMENT MASON/CONCRETE FINISHER$23.25$12.31$35.56
CARPENTER, INCLUDES FORM WORK$25.41$9.98$35.39
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS)$37.19$17.00$54.19
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS)$36.75$17.00$53.75
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS)$36.12$17.00$53.12
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS)$36.01$17.00$53.01
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS)$35.78$17.00$52.78
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS)$35.60$17.00$52.60