| ELECTRICIAN | $40.00 | $18.74 | $58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. Trucks 100 ft to 150 ft $.15 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 |
| TRUCK DRIVER: WATER TRUCK | $23.89 | $9.52 | $33.41 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| TRUCK DRIVER: DUMP TRUCK | $17.11 | $0.00 | $17.11 |
| PAINTER: ROLLER AND SPRAY | $17.06 | $0.65 | $17.71 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: LOADER (FRONT END) | $21.33 | $4.25 | $25.58 |
| OPERATOR: GRADER/BLADE | $25.17 | $9.44 | $34.61 |
| OPERATOR: FORKLIFT | $21.98 | $0.00 | $21.98 |
| OPERATOR: CRANE | $27.59 | $9.60 | $37.19 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.00 | $0.00 | $17.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.06 | $0.00 | $21.06 |
| LABORER: PIPELAYER | $16.39 | $0.00 | $16.39 |
| LABORER: COMMON OR GENERAL | $22.13 | $11.98 | $34.11 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $5.67 | $22.83 |
| CARPENTER, EXCLUDES FORM WORK | $28.00 | $0.00 | $28.00 |
| CARPENTER (FORM WORK ONLY) | $28.00 | $0.00 | $28.00 |