Highway construction wages: Shoshone, Idaho
Wage determination ID20260084 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/ID20260084 on · latest revision 1 · verify at sam.gov/wage-determination/ID20260084/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER (CEMENT/CONCRETE) | $28.21 | $13.00 | $41.21 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
| TRUCK DRIVER: WATER TRUCK | $23.12 | $10.75 | $33.87 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $22.12 | $13.20 | $35.32 |
| TRUCK DRIVER: DUMP TRUCK | $23.40 | $10.75 | $34.15 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: FLAGGER | $21.46 | $10.12 | $31.58 |
| OPERATOR: SCREED | $25.71 | $11.55 | $37.26 |
| OPERATOR: ROTOMILL | $29.78 | $4.52 | $34.30 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 |
| OPERATOR: ROLLER | $25.49 | $11.55 | $37.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 |
| OPERATOR: MECHANIC | $26.00 | $9.93 | $35.93 |
| OPERATOR: LOADER | $25.76 | $10.31 | $36.07 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 |
| OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 |
| OPERATOR: CRANE | $27.18 | $10.97 | $38.15 |
| OPERATOR: BULLDOZER | $25.73 | $11.51 | $37.24 |
| OPERATOR: BROOM/SWEEPER | $26.82 | $11.55 | $38.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.95 | $36.92 |
| LABORER: GRADE CHECKER | $23.41 | $10.78 | $34.19 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 |
| LABORER: COMMON OR GENERAL | $23.18 | $9.40 | $32.58 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $22.86 | $9.40 | $32.26 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $23.80 | $6.67 | $30.47 |
| ELECTRICIAN | $26.83 | $11.94 | $38.77 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.