Plumber prevailing wages: Missouri, county by county
105 current plumber rates across 60 active Missouri wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Adair, Atchison | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ATCHISON COUNTY) | $49.45 | $26.65 | $76.10 | MO20260028 Building |
| Adair, Atchison | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (ADAIR COUNTY) | $46.66 | $21.99 | $68.65 | MO20260028 Building |
| Adair, Atchison | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (ADAIR COUNTY) | $46.66 | $21.99 | $68.65 | MO20260028 Building |
| Andrew, Buchanan, De Kalb | PLUMBER | $47.45 | $26.15 | $73.60 | MO20260065 Residential |
| Andrew, Buchanan, De Kalb | PLUMBER | $58.38 | $25.29 | $83.67 | MO20260081 Building |
| Audrain | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260002 Building |
| Audrain | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260002 Building |
| Barry, Barton, Benton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $58.38 | $25.29 | $83.67 | MO20260029 Building |
| Barry, Barton, Benton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | $52.57 | MO20260029 Building |
| Barry, Barton, Benton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS $750,000 & UNDER) | $31.28 | $15.32 | $46.60 | MO20260029 Building |
| Barry, Barton, Benton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS OVER $750,000) | $34.25 | $15.32 | $49.57 | MO20260029 Building |
| Bates + 5 more | PLUMBER | $58.38 | $25.29 | $83.67 | MO20260082 Building |
| Bates + 7 more | PLUMBER (BATES, LAFAYETTE & RAY COUNTIES) | $56.63 | $24.54 | $81.17 | MO20260066 Residential |
| Bates + 7 more | PLUMBER (CALDWELL & CLINTON COUNTIES) | $47.45 | $26.15 | $73.60 | MO20260066 Residential |
| Bates + 7 more | PLUMBER (CASS, CLAY & PLATTE COUNTIES) | $56.63 | $24.54 | $81.17 | MO20260066 Residential |
| Bollinger, Cape Girardeau | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260083 Building |
| Butler | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260004 Building |
| Butler | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260004 Building |
| Callaway + 3 more | PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 | $79.98 | MO20260068 Residential |
| Callaway + 3 more | PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 | $79.98 | MO20260068 Residential |
| Callaway, Cole, Osage | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260085 Building |
| Camden | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260005 Building |
| Camden | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260005 Building |
| Carroll | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | MO20260007 Building |
| Cass | PLUMBER | $58.38 | $25.29 | $83.67 | MO20260072 Building |
| Cedar | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 | MO20260008 Building |
| Chariton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260009 Building |
| Chariton | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260009 Building |
| Christian + 3 more | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260086 Building |
| Christian + 4 more | PLUMBER | $39.35 | $15.72 | $55.07 | MO20260069 Residential |
| Clinton | PLUMBER | $58.38 | $25.29 | $83.67 | MO20260073 Building |
| Cooper | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260010 Building |
| Cooper | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260010 Building |
| Crawford | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 | MO20260056 Building |
| Crawford | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 | MO20260056 Building |
| Crawford + 6 more | PLUMBER (JEFFERSON, ST CHARLES, AND ST LOUIS COUNTIES) | $52.60 | $29.93 | $82.53 | MO20260070 Residential |
| Crawford + 6 more | PLUMBER: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CRAWFORD, LINCOLN, WARREN, & WASHINGTON COUNTIES) | $50.60 | $29.38 | $79.98 | MO20260070 Residential |
| Crawford + 6 more | PLUMBER: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CRAWFORD, LINCOLN, WARREN, & WASHINGTON COUNTIES) | $50.60 | $29.38 | $79.98 | MO20260070 Residential |
| Dunklin | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260011 Building |
| Dunklin | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260011 Building |
| Franklin | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260062 Residential |
| Franklin | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260074 Building |
| Gasconade + 5 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MORGAN COUNTY) | $58.38 | $25.29 | $83.67 | MO20260033 Building |
| Gasconade + 5 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (DENT, GASCONADE, MARIES, MILLER, & MONTGOMERY COUNTIES) | $48.66 | $30.13 | $78.79 | MO20260033 Building |
| Gasconade + 5 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (DENT, GASCONADE, MARIES, MILLER, & MONTGOMERY COUNTIES) | $50.60 | $29.38 | $79.98 | MO20260033 Building |
| Greene | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260075 Building |
| Henry + 8 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $39.35 | $15.72 | $55.07 | MO20260032 Building |
| Henry + 8 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (HENRY & ST. CLAIR COUNTIES) | $58.38 | $25.29 | $83.67 | MO20260032 Building |
| Howard, Boone | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260084 Building |
| Howard, Boone | PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 | $79.98 | MO20260067 Residential |
| Howard, Boone | PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 | $79.98 | MO20260067 Residential |
| Jackson | PLUMBER | $56.63 | $24.54 | $81.17 | MO20260063 Residential |
| Jasper | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260076 Building |
| Jasper, McDonald, Newton | PLUMBER | $36.38 | $15.72 | $52.10 | MO20260071 Residential |
| Jefferson | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260077 Building |
| Johnson | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | MO20260012 Building |
| Knox + 114 more | LABORER: PLUMBER LABORER (ST. LOUIS (CITY AND COUNTY)) | $40.82 | $17.56 | $58.38 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS (BATES, BENTON, CARROLL, HENRY, LAFAYETTE, MORGAN, PETTIS, RAY, ST. CLAIR, SALINE AND VERNON COUNTIES) | $56.63 | $24.54 | $81.17 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS (CASS, CLAY, JACKSON, JOHNSON, AND PLATTE COUNTIES) | $56.63 | $24.54 | $81.17 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS (ANDREW, ATCHISON, BUCHANAN, CALDWELL, CLINTON, DAVIESS, DEKALB, GENTRY, HARRISON, HOLT, NODAWAY AND WORTH COUNTIES) | $47.45 | $26.15 | $73.60 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS (BARRY, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, LACLEDE, LAWRENCE, POLK, STONE, TANEY, WEBSTER AND WRIGHT COUNTIES) | $39.35 | $15.72 | $55.07 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY,CAMDEN, CAPE GIRARDEAU,CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, DUNKLIN, FRANKLIN, GASCONADE, GRUNDY, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCOLN, LINN, LIVINGSTON, MACON, MADISON, MARIES, MARION, MERCER, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY, NEW MADRID, OREGON, OSAGE, PEMISCOTT, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST.FRANCOIS, STE. GENEVIEVE, ST. LOUIS, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD, SULLIVAN, TEXAS, WARREN, WASHINGTON,AND WAYNE COUNTIES.) | $46.66 | $21.99 | $68.65 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY,CAMDEN, CAPE GIRARDEAU,CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, DUNKLIN, FRANKLIN, GASCONADE, GRUNDY, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCOLN, LINN, LIVINGSTON, MACON, MADISON, MARIES, MARION, MERCER, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY, NEW MADRID, OREGON, OSAGE, PEMISCOTT, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST.FRANCOIS, STE. GENEVIEVE, ST. LOUIS, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD, SULLIVAN, TEXAS, WARREN, WASHINGTON,AND WAYNE COUNTIES.) | $46.66 | $21.99 | $68.65 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS: PROJECTS $750,000 & UNDER (BARTON, JASPER, MCDONALD AND NEWTON COUNTIES) | $32.78 | $15.32 | $48.10 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS AND PIPEFITTERS: PROJECTS OVER $750,000 (BARTON, JASPER, MCDONALD AND NEWTON COUNTIES) | $35.75 | $15.32 | $51.07 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIES, MILLER, MONITEAU, OSAGE, PHELPS, PULASKI, ST. CHARLES, ST. LOUIS (CITY AND COUNTY), WARREN AND WASHINGTON COUNTIES) | $46.66 | $21.99 | $68.65 | MO20260001 Heavy, Highway |
| Knox + 114 more | PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIES, MILLER, MONITEAU, OSAGE, PHELPS, PULASKI, ST. CHARLES, ST. LOUIS (CITY AND COUNTY), WARREN AND WASHINGTON COUNTIES) | $46.66 | $21.99 | $68.65 | MO20260001 Heavy, Highway |
| Knox + 23 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (DAVIESS, GENTRY, HARRISON, HOLT, NODAWAY, & WORTH COUNTIES) | $49.45 | $26.65 | $76.10 | MO20260031 Building |
| Knox + 23 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (SALINE COUNTY) | $58.38 | $25.29 | $83.67 | MO20260031 Building |
| Knox + 23 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CLARK, GRUNDY, KNOX, LEWIS, LINN, LIVINGSTON, MACON, MARION, MERCER, MONROE, PIKE, PUTNAM, PANDOLPH, SCHUYLER, SCOTLAND, SHELBY & SULLIVAN COUNTIES) | $48.66 | $22.79 | $71.45 | MO20260031 Building |
| Knox + 23 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CLARK, GRUNDY, KNOX, LEWIS, LINN, LIVINGSTON, MACON, MARION, MERCER, MONROE, PIKE, PUTNAM, PANDOLPH, SCHUYLER, SCOTLAND, SHELBY & SULLIVAN COUNTIES) | $50.60 | $30.13 | $80.73 | MO20260031 Building |
| Lawrence | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.25 | $9.77 | $32.02 | MO20260013 Building |
| Lincoln, St Charles, Warren | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260087 Building |
| McDonald, Newton | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260088 Building |
| Mississippi | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260014 Building |
| Mississippi | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260014 Building |
| Moniteau | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260078 Building |
| New Madrid | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260015 Building |
| New Madrid | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260015 Building |
| Pemiscot | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260016 Building |
| Pemiscot | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260016 Building |
| Pettis | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | MO20260017 Building |
| Phelps | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260018 Building |
| Phelps | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260018 Building |
| Platte | PLUMBER | $58.38 | $25.29 | $83.67 | MO20260079 Building |
| Pulaski | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260019 Building |
| Pulaski | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260019 Building |
| Ralls | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260020 Building |
| Ralls | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260020 Building |
| Ripley | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260021 Building |
| Ripley | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260021 Building |
| Scott | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $23.90 | $0.00 | $23.90 | MO20260022 Building |
| Shannon | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260023 Building |
| Shannon | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260023 Building |
| St Francois + 9 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260030 Building |
| St Francois + 9 more | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260030 Building |
| St Louis City | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260064 Residential |
| St Louis City | PLUMBER | $54.60 | $30.23 | $84.83 | MO20260080 Building |
| St Louis, Washington | PLUMBER | $52.60 | $29.93 | $82.53 | MO20260089 Building |
| Stoddard | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260024 Building |
| Stoddard | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260024 Building |
| Texas | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | MO20260025 Building |
| Texas | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | MO20260025 Building |
| Vernon | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | MO20260026 Building |
| Wright | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 | MO20260027 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Missouri trades.