Residential construction wages: Callaway + 3 more counties, Missouri
Wage determination MO20260068 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260068 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260068/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
| ELECTRICIAN | $18.23 | $9.91 | $28.14 |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.61 | $29.50 | $64.11 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $34.61 | $29.50 | $64.11 |
| LABORER: COMMON OR GENERAL (OSAGE COUNTY) | $25.84 | $14.86 | $40.70 |
| LABORER: BRICK MASON TENDER (OSAGE COUNTY) | $25.84 | $14.86 | $40.70 |
| LABORER: COMMON OR GENERAL (CALLAWAY, COLE & MONITEAU COUNTIES) | $23.94 | $15.80 | $39.74 |
| LABORER: BRICK MASON TENDER (CALLAWAY, COLE & MONITEAU COUNTIES) | $23.94 | $15.80 | $39.74 |
| PAINTER (BRUSH AND ROLLER) | $28.56 | $17.21 | $45.77 |
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 | $79.98 |
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 | $79.98 |
| ROOFER | $33.60 | $19.99 | $53.59 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (MONITEAU COUNTY) | $27.37 | $8.14 | $35.51 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (CALLAWAY, COLE, AND OSAGE COUNTIES) | $36.51 | $22.39 | $58.90 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER | $18.33 | $1.32 | $19.65 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.