Building construction wages: Mississippi, Missouri
Wage determination MO20260014 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260014 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260014/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.19 | $24.24 | $62.43 |
| BRICKLAYER | $31.51 | $15.00 | $46.51 |
| TILE SETTER | $31.51 | $15.00 | $46.51 |
| CARPENTER (INCLUDING FORMWORK) | $32.59 | $21.85 | $54.44 |
| CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY) | $40.08 | $21.85 | $61.93 |
| ELECTRICIAN | $49.29 | $33.64 | $82.93 |
| ELEVATOR MECHANIC | $62.73 | $38.44 | $101.17 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $34.47 | $24.85 | $59.32 |
| LABORER (BRICK MASON TENDER) | $30.48 | $14.91 | $45.39 |
| CEMENT MASON/CONCRETE FINISHER | $35.10 | $18.78 | $53.88 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| ROOFER | $32.25 | $17.46 | $49.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 | $73.47 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| PAINTER: ROLLER | $16.44 | $6.01 | $22.45 |
| PAINTER: BRUSH ONLY | $16.44 | $6.01 | $22.45 |
| OPERATOR: GRADER/BLADE | $22.80 | $10.78 | $33.58 |
| LABORER: COMMON OR GENERAL | $11.64 | $3.72 | $15.36 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.