Building construction wages: Chariton, Missouri
Wage determination MO20260009 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260009 on · latest revision 2 · verify at sam.gov/wage-determination/MO20260009/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $32.79 | $21.31 | $54.10 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
| CARPENTER, EXCLUDES FORM WORK | $31.51 | $22.25 | $53.76 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | $22.42 | $67.90 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 |
| LABORER (LANDSCAPE) | $27.71 | $15.50 | $43.21 |
| LABORER (BRICK MASON TENDER) | $29.71 | $15.50 | $45.21 |
| PAINTER (BRUSH & ROLLER ONLY) | $28.56 | $17.21 | $45.77 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 | $73.48 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 |
| LABORER: COMMON OR GENERAL | $23.20 | $0.00 | $23.20 |
| GLAZIER | $14.19 | $5.19 | $19.38 |
| FORM WORKER | $26.44 | $0.00 | $26.44 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 |