Building construction wages: Scott, Missouri
Wage determination MO20260022 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260022 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260022/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 |
| TILE SETTER | $31.51 | $15.00 | $46.51 |
| CARPENTER (INCLUDING FORMWORK) | $32.59 | $21.85 | $54.44 |
| CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY) | $40.08 | $21.85 | $61.93 |
| ELECTRICIAN | $49.29 | $33.64 | $82.93 |
| ELEVATOR MECHANIC | $62.73 | $38.44 | $101.17 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $34.47 | $24.85 | $59.32 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $30.48 | $14.91 | $45.39 |
| LABORER (BRICK MASON TENDER) | $31.80 | $14.91 | $46.71 |
| CEMENT MASON/CONCRETE FINISHER | $35.10 | $18.78 | $53.88 |
| PIPEFITTER (HVAC PIPE INSTALLATION) (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 |
| PIPEFITTER (HVAC PIPE INSTALLATION) (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 |
| ROOFER | $32.25 | $17.46 | $49.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 | $73.47 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $23.90 | $0.00 | $23.90 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $32.74 | $0.00 | $32.74 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| PAINTER: ROLLER | $16.44 | $6.01 | $22.45 |
| PAINTER: BRUSH ONLY | $16.44 | $6.01 | $22.45 |
| OPERATOR: GRADER/BLADE | $22.80 | $10.78 | $33.58 |
| BRICKLAYER | $29.75 | $0.00 | $29.75 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.