Building construction wages: St Louis, Washington, Missouri
Wage determination MO20260089 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260089 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260089/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $43.48 | $27.24 | $70.72 |
| BRICKLAYER | $41.15 | $23.90 | $65.05 |
| TILE SETTER | $34.09 | $20.36 | $54.45 |
| CARPENTER | $39.78 | $22.40 | $62.18 |
| FLOOR LAYER: SOFT FLOORS | $40.08 | $21.85 | $61.93 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN) | $49.29 | $33.64 | $82.93 |
| ELECTRICIAN | $49.29 | $33.64 | $82.93 |
| ELEVATOR MECHANIC | $62.73 | $38.44 | $101.17 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | $30.22 | $73.68 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | $30.22 | $73.68 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | $30.22 | $73.68 |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | $30.57 | $76.53 |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | $30.57 | $76.53 |
| IRONWORKER | $44.27 | $31.65 | $75.92 |
| LABORER: PIPELAYER | $40.82 | $17.56 | $58.38 |
| LABORER, COMMON OR GENERAL (PROJECTS UNDER 2,000,000) | $32.23 | $15.91 | $48.14 |
| LABORER, COMMON OR GENERAL (PROJECTS OVER $20,000,000) | $35.73 | $15.91 | $51.64 |
| LABORER, COMMON OR GENERAL (PROJECTS BETWEEN $1,000,000 & $20,000,000) | $34.23 | $15.91 | $50.14 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 | $46.71 |
| PAINTER | $39.40 | $17.66 | $57.06 |
| CEMENT MASON/CONCRETE FINISHER | $38.46 | $20.15 | $58.61 |
| PIPEFITTER | $52.60 | $29.93 | $82.53 |
| PLUMBER | $52.60 | $29.93 | $82.53 |
| ROOFER | $40.00 | $22.05 | $62.05 |
| SPRINKLER FITTER | $51.73 | $29.55 | $81.28 |
| SHEET METAL WORKER | $52.00 | $27.12 | $79.12 |
| OPERATOR: ROLLER | $39.61 | $30.15 | $69.76 |
| LABORER: MASON TENDER - BRICK | $37.58 | $17.21 | $54.79 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.