Building construction wages: Johnson, Missouri
Wage determination MO20260012 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260012 on · latest revision 2 · verify at sam.gov/wage-determination/MO20260012/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $40.53 | $15.99 | $56.52 |
| BRICKLAYER | $39.85 | $21.70 | $61.55 |
| CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $42.06 | $22.40 | $64.46 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | $22.42 | $67.90 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORER (LANDSCAPE) | $26.50 | $13.18 | $39.68 |
| LABORER (BRICK MASON TENDER) | $28.00 | $13.18 | $41.18 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $31.74 | $17.76 | $49.50 |
| PAINTER (BRUSH & ROLLER ONLY) | $30.54 | $17.76 | $48.30 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 | $85.86 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $50.43 | $26.96 | $77.39 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 |
| LABORER: COMMON OR GENERAL | $16.18 | $7.12 | $23.30 |
| GLAZIER | $22.71 | $0.00 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.33 | $7.42 | $30.75 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.