Building construction wages: Johnson, Missouri
Wage determination MO20260012 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260012 on · latest revision 2 · verify at sam.gov/wage-determination/MO20260012/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $40.53 | $15.99 | $56.52 |
| BRICKLAYER | $39.85 | $21.70 | $61.55 |
| CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $42.06 | $22.40 | $64.46 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | $22.42 | $67.90 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORER (LANDSCAPE) | $26.50 | $13.18 | $39.68 |
| LABORER (BRICK MASON TENDER) | $28.00 | $13.18 | $41.18 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $31.74 | $17.76 | $49.50 |
| PAINTER (BRUSH & ROLLER ONLY) | $30.54 | $17.76 | $48.30 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 | $85.86 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $50.43 | $26.96 | $77.39 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 |
| LABORER: COMMON OR GENERAL | $16.18 | $7.12 | $23.30 |
| GLAZIER | $22.71 | $0.00 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.33 | $7.42 | $30.75 |