Building construction wages: Barry, Barton, Benton, Missouri
Wage determination MO20260029 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260029 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260029/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 |
| TILE SETTER (BENTON COUNTY) | $32.79 | $21.31 | $54.10 |
| BRICKLAYER (BENTON COUNTY) | $32.79 | $21.31 | $54.10 |
| BRICKLAYER (BARRY & BARTON COUNTIES) | $33.67 | $19.48 | $53.15 |
| TILE SETTER (BARRY & BARTON COUNTIES) | $26.47 | $14.89 | $41.36 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BENTON COUNTY) | $31.51 | $22.25 | $53.76 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BARRY & BARTON COUNTIES) | $29.50 | $21.50 | $51.00 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BARRY & BARTON COUNTIES) | $32.25 | $20.81 | $53.06 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BENTON COUNTY) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER (BARRY & BARTON COUNTIES) | $30.91 | $18.07 | $48.98 |
| POWER EQUIPMENT OPERATOR: LOADER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: ROLLER (BENTON COUNTY) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: LOADER (BENTON COUNTY) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BENTON COUNTY) | $45.48 | $22.42 | $67.90 |
| IRONWORKER: REINFORCING AND STRUCTURAL (BARRY COUNTY) | $36.00 | $34.25 | $70.25 |
| IRONWORKER, REINFORCING AND STRUCTURAL (BARTON & BENTON COUNTIES) | $36.00 | $34.25 | $70.25 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARTON & BENTON COUNTIES) | $26.50 | $13.18 | $39.68 |
| LABORER: BRICK MASON TENDER (BARTON & BENTON COUNTIES) | $28.00 | $13.18 | $41.18 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARRY COUNTY) | $27.05 | $13.62 | $40.67 |
| LABORER: BRICK MASON TENDER (BARRY COUNTY) | $29.78 | $13.62 | $43.40 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (BENTON COUNTY) | $25.39 | $17.76 | $43.15 |
| PAINTER: BRUSH & ROLLER ONLY (BENTON COUNTY) | $24.43 | $17.76 | $42.19 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $25.79 | $15.35 | $41.14 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $58.38 | $25.29 | $83.67 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS OVER $750,000) | $34.25 | $15.32 | $49.57 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS $750,000 & UNDER) | $31.28 | $15.32 | $46.60 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | $52.57 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS OVER $750,000) | $35.75 | $15.32 | $51.07 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS $750,000 & UNDER) | $32.78 | $15.32 | $48.10 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | $52.57 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $57.51 | $28.35 | $85.86 |
| ROOFER | $30.73 | $14.51 | $45.24 |
| SHEET METAL WORKER (BARTON & BENTON COUNTIES) | $47.20 | $26.28 | $73.48 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (BARRY COUNTY) | $34.43 | $17.86 | $52.29 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 |
| GLAZIER | $22.71 | $0.00 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.