Building construction wages: Audrain, Missouri
Wage determination MO20260002 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260002 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/MO20260002/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 |
| TILE SETTER | $32.79 | $21.31 | $54.10 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION (EAST OF HIGHWAY 19) | $39.53 | $21.85 | $61.38 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER (EAST OF HIGHWAY 19) | $41.30 | $21.85 | $63.15 |
| CARPENTER, EXCLUDES FORM WORK (WEST OF HIGHWAY 19) | $31.51 | $22.25 | $53.76 |
| ELECTRICIAN (WEST OF HIGHWAY 19) | $40.50 | $23.26 | $63.76 |
| ELECTRICIAN (EAST OF HIGHWAY 19) | $37.60 | $22.14 | $59.74 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $28.78 | $16.05 | $44.83 |
| LABORER (BRICK MASON TENDER) | $30.78 | $16.05 | $46.83 |
| PAINTER (BRUSH & ROLLER ONLY) | $28.56 | $17.21 | $45.77 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| ROOFER | $33.60 | $19.99 | $53.59 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $36.51 | $22.39 | $58.90 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 |
| GLAZIER | $14.19 | $5.19 | $19.38 |
| FORM WORKER | $26.44 | $0.00 | $26.44 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 |