Building construction wages: St Francois + 9 more counties, Missouri

Wage determination MO20260030 · Active · Standard · verify on SAM.gov

St FrancoisSte GenevieveCarterHowellIronMadisonOregonPerryReynoldsWayne

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$43.48$27.24$70.72
ASBESTOS WORKER/HEAT & FROST INSULATOR (HOWELL & OREGON COUNTIES)$31.97$14.00$45.97
BRICKLAYER (CARTER COUNTY)$34.98$15.03$50.01
BRICKLAYER (HOWELL & OREGON COUNTIES)$33.67$19.48$53.15
TILE SETTER (CARTER, HOWELL & OREGON COUNTIES)$26.47$14.89$41.36
BRICKLAYER (IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$31.51$15.00$46.51
TILE SETTER (IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$31.51$15.00$46.51
CARPENTER, INCLUDING FORM WORK (IRON, MADISON, REYNOLDS & ST FRANCOIS COUNTIES) (Projects under $1 million)$33.05$21.85$54.90
CARPENTER, INCLUDING FORM WORK (IRON, MADISON, REYNOLDS & ST FRANCOIS COUNTIES) (Projects $1 million and over)$36.57$21.85$58.42
CARPENTER: INCLUDING FORMWORK (CARTER, HOWELL, OREGON, PERRY, STE GENEVIEVE & WAYNE COUNTIES)$32.59$21.85$54.44
CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY)$40.08$21.85$61.93
ELECTRICIAN (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, & WAYNE COUNTIES)$49.29$33.64$82.93
ELECTRICIAN (HOWELL & OREGON COUNTIES)$32.40$19.11$51.51
ELEVATOR MECHANIC$62.73$38.44$101.17
POWER EQUIPMENT OPERATOR: ROLLER (HOWELL & OREGON COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: PAVER (HOWELL & OREGON COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: LOADER (HOWELL & OREGON COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: BULLDOZER (HOWELL & OREGON COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HOWELL & OREGON COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: ROLLER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: PAVER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: LOADER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: BULLDOZER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.06$30.38$69.44
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.06$30.38$69.44
IRONWORKER, REINFORCING AND STRUCTURAL (HOWELL & OREGON COUNTIES)$41.67$31.25$72.92
IRONWORKER, REINFORCING AND STRUCTURAL (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, & WAYNE COUNTIES)$41.67$31.25$72.92
LABORER: COMMON OR GENERAL & LANDSCAPE (HOWELL & OREGON COUNTIES)$30.33$15.30$45.63
LABORER: BRICK MASON TENDER (HOWELL & OREGON COUNTIES)$32.23$15.30$47.53
LABORER: COMMON OR GENERAL & LANDSCAPE (CARTER & WAYNE COUNTIES)$30.48$14.91$45.39
LABORER: BRICK MASON TENDER (CARTER & WAYNE COUNTIES)$31.80$14.91$46.71
LABORER: COMMON OR GENERAL & LANDSCAPE (IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS & STE GENEVIEVE COUNTIES)$30.93$15.91$46.84
LABORER: BRICK MASON TENDER (IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS & STE GENEVIEVE COUNTIES)$32.23$15.91$48.14
CEMENT MASON/CONCRETE FINISHER: PROJECTS UNDER $10 MILLION (IRON, MADISON, REYNOLDS, ST. FRANCOIS, & STE. GENEVIEVE COUNTIES)$36.59$20.23$56.82
CEMENT MASON/CONCRETE FINISHER: PROJECTS $10 MILLION AND OVER (IRON, MADISON, REYNOLDS, ST. FRANCOIS, & STE. GENEVIEVE COUNTIES)$37.29$20.23$57.52
CEMENT MASON/CONCRETE FINISHER (CARTER, HOWELL, OREGON, PERRY, & WAYNE COUNTIES)$35.10$18.78$53.88
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)$50.66$23.34$74.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)$52.60$29.93$82.53
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)$50.66$23.34$74.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)$52.60$29.93$82.53
ROOFER (CARTER, IRON, MADISON, OREGON, PERRY, REYNOLDS, & WAYNE COUNTIES)$32.25$17.46$49.71
ROOFER (ST FRANCOIS & STE GENEVIEVE COUNTIES)$40.00$22.05$62.05
ROOFER (HOWELL COUNTY)$30.73$14.51$45.24
SPRINKLER FITTER (FIRE SPRINKLERS)$45.94$27.53$73.47
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (IRON, MADISON, PERRY, ST FRANCOIS, STE GENEVIEVE, & WAYNE COUNTIES)$52.00$27.12$79.12
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (CARTER, HOWELL, OREGON, & REYNOLDS COUNTIES)$34.43$17.86$52.29
TRUCK DRIVER: DUMP TRUCK$25.57$0.00$25.57
PAINTER: SPRAY$18.79$8.12$26.91
PAINTER: ROLLER$16.44$6.01$22.45
PAINTER: BRUSH ONLY$16.44$6.01$22.45
OPERATOR: GRADER/BLADE$22.80$10.78$33.58

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.