Building construction wages: Camden, Missouri
Wage determination MO20260005 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260005 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260005/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 |
| TILE SETTER | $32.79 | $21.31 | $54.10 |
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | $31.51 | $22.25 | $53.76 |
| CARPENTER (FLOOR LAYER) (RESILIENT/VINYL FLOOR INSTALLATION ONLY) | $31.39 | $22.25 | $53.64 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 | $48.98 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.41 | $18.07 | $51.48 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $27.91 | $18.07 | $45.98 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | $18.07 | $49.69 |
| IRONWORKER, STRUCTURAL | $41.67 | $31.25 | $72.92 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $26.35 | $13.01 | $39.36 |
| LABORER (BRICK MASON TENDER) | $29.08 | $13.01 | $42.09 |
| PAINTER: DRYWALL FINISHING/TAPING | $33.90 | $17.21 | $51.11 |
| CEMENT MASON/CONCRETE FINISHER | $33.52 | $15.88 | $49.40 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| ROOFER | $33.60 | $19.99 | $53.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 | $73.47 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 | $73.48 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| PAINTER: ROLLER | $18.79 | $8.12 | $26.91 |
| PAINTER: BRUSH ONLY | $18.79 | $8.12 | $26.91 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $24.90 | $0.00 | $24.90 |
| IRONWORKER, REINFORCING | $21.02 | $9.49 | $30.51 |
| GLAZIER | $29.87 | $1.47 | $31.34 |
| ELECTRICIAN | $25.82 | $8.24 | $34.06 |
| BRICKLAYER | $27.66 | $5.88 | $33.54 |