Building construction wages: Crawford, Missouri
Wage determination MO20260056 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260056 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260056/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $46.00 | $36.25 | $82.25 |
| BRICKLAYER | $41.15 | $23.90 | $65.05 |
| TILE SETTER | $34.09 | $19.91 | $54.00 |
| TILE FINISHER | $28.50 | $18.15 | $46.65 |
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | $44.19 | $21.85 | $66.04 |
| CARPENTER (FLOOR LAYING-CARPET AND VINYL ONLY) | $40.08 | $21.85 | $61.93 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING INSTALLER; ALARM, COMPUTER & TELEPHONE INSTALLATION) | $40.50 | $23.26 | $63.76 |
| ELEVATOR MECHANIC | $62.73 | $38.44 | $101.17 |
| POWER EQUIPMENT OPERATORS: ROLLER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: PAVER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: LOADER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: CRANE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | $39.06 | $30.38 | $69.44 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 |
| LABORER: COMMON OR GENERAL; ASPHALT SHOVELER; PIPELAYER | $30.33 | $15.30 | $45.63 |
| LABORER: BRICK & CEMENT/CONCRETE MASON TENDER | $32.23 | $15.30 | $47.53 |
| GLAZIER | $40.00 | $24.25 | $64.25 |
| PAINTER (DRYWALL FINISHING/TAPING) | $34.90 | $17.21 | $52.11 |
| PAINTER (BRUSH AND ROLLER) | $33.90 | $17.21 | $51.11 |
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 |
| ROOFER | $40.00 | $22.05 | $62.05 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.52 | $73.46 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 |
| PAINTER: SPRAY | $17.78 | $0.00 | $17.78 |
| OPERATOR: HOIST | $26.02 | $13.01 | $39.03 |