Residential construction wages: Howard, Boone, Missouri
Wage determination MO20260067 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260067 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260067/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
| ELECTRICIAN | $18.23 | $9.91 | $28.14 |
| POWER EQUIPMENT OPERATOR: ROLLER (HOWARD COUNTY) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (HOWARD COUNTY) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: ROLLER (BOONE COUNTY) | $34.61 | $29.50 | $64.11 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BOONE COUNTY) | $34.61 | $29.50 | $64.11 |
| LABORER: COMMON OR GENERAL | $23.94 | $15.80 | $39.74 |
| LABORER (BRICK MASON TENDER) | $23.94 | $15.80 | $39.74 |
| PAINTER (BRUSH AND ROLLER) | $28.56 | $17.21 | $45.77 |
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 | $79.98 |
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 | $79.98 |
| ROOFER | $33.60 | $19.99 | $53.59 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (HOWARD COUNTY) | $27.37 | $8.14 | $35.51 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (BOONE COUNTY) | $36.51 | $22.39 | $58.90 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER | $18.33 | $1.32 | $19.65 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.