Building construction wages: Cass, Missouri
Wage determination MO20260072 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260072 on · latest revision 2 · verify at sam.gov/wage-determination/MO20260072/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $43.60 | $33.52 | $77.12 |
| BRICKLAYER | $40.53 | $16.69 | $57.22 |
| TILE SETTER | $34.09 | $20.36 | $54.45 |
| CARPENTER | $44.63 | $22.40 | $67.03 |
| ELECTRICIAN | $54.01 | $27.85 | $81.86 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| OPERATOR: FORKLIFT | $44.14 | $22.42 | $66.56 |
| OPERATOR: CRANE | $47.29 | $22.42 | $69.71 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | $30.57 | $76.53 |
| IRONWORKER | $39.00 | $34.25 | $73.25 |
| LABORER: PIPELAYER | $40.82 | $17.56 | $58.38 |
| LABORER: COMMON OR GENERAL | $31.60 | $18.25 | $49.85 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 | $46.71 |
| CEMENT MASON/CONCRETE FINISHER | $40.13 | $20.50 | $60.63 |
| PLUMBER | $58.38 | $25.29 | $83.67 |
| PIPEFITTER | $57.51 | $28.35 | $85.86 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SPRINKLER FITTER | $45.85 | $25.50 | $71.35 |
| SHEET METAL WORKER | $50.43 | $26.45 | $76.88 |
| PAINTER | $24.14 | $9.67 | $33.81 |
| OPERATOR: LOADER | $38.39 | $17.55 | $55.94 |
| LABORER: MASON TENDER - BRICK | $34.05 | $15.73 | $49.78 |
| OPERATOR: ROLLER | $39.61 | $30.15 | $69.76 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.