Building construction wages: Lawrence, Missouri
Wage determination MO20260013 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260013 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260013/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 |
| BRICKLAYER | $33.67 | $19.48 | $53.15 |
| TILE SETTER | $26.47 | $14.89 | $41.36 |
| CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $29.50 | $21.50 | $51.00 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $32.25 | $20.81 | $53.06 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 | $48.98 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | $18.07 | $49.69 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 |
| LABORER (LANDSCAPE) | $27.05 | $13.62 | $40.67 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) | $25.79 | $15.35 | $41.14 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 |
| ROOFER | $30.73 | $14.51 | $45.24 |
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $34.43 | $17.86 | $52.29 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.31 | $9.05 | $32.36 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.25 | $9.77 | $32.02 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 |
| OPERATOR: BACKHOE/TRACKHOE | $19.80 | $7.47 | $27.27 |
| LABORER: MASON TENDER - BRICK | $15.80 | $7.31 | $23.11 |
| LABORER: COMMON OR GENERAL | $14.99 | $6.99 | $21.98 |
| GLAZIER | $20.26 | $2.45 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $18.22 | $7.85 | $26.07 |