Building construction wages: Lawrence, Missouri

Wage determination MO20260013 · Active · Standard · verify on SAM.gov

Lawrence

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 removed.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$31.97$14.00$45.97
BRICKLAYER$33.67$19.48$53.15
TILE SETTER$26.47$14.89$41.36
CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY)$29.50$21.50$51.00
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)$32.25$20.81$53.06
ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY$60.69$38.44$99.13
POWER EQUIPMENT OPERATOR: ROLLER$30.91$18.07$48.98
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.62$18.07$49.69
POWER EQUIPMENT OPERATOR: BULLDOZER$31.62$18.07$49.69
POWER EQUIPMENT OPERATOR: (LOADER)$31.62$18.07$49.69
IRONWORKER: REINFORCING AND STRUCTURAL$36.00$34.25$70.25
LABORER (LANDSCAPE)$27.05$13.62$40.67
PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES)$25.79$15.35$41.14
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION$39.35$15.72$55.07
ROOFER$30.73$14.51$45.24
SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY)$34.43$17.86$52.29
TRUCK DRIVER: DUMP TRUCK$28.92$0.00$28.92
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$23.31$9.05$32.36
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$22.25$9.77$32.02
PAINTER: SPRAY$18.79$8.12$26.91
OPERATOR: WATER TRUCK$28.37$0.00$28.37
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.47$0.00$24.47
OPERATOR: BACKHOE/TRACKHOE$19.80$7.47$27.27
LABORER: MASON TENDER - BRICK$15.80$7.31$23.11
LABORER: COMMON OR GENERAL$14.99$6.99$21.98
GLAZIER$20.26$2.45$22.71
CEMENT MASON/CONCRETE FINISHER$17.95$6.64$24.59
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$18.22$7.85$26.07

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.