Building construction wages: Lawrence, Missouri
Wage determination MO20260013 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/MO20260013 on · latest revision 1 · verify at sam.gov/wage-determination/MO20260013/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 |
| BRICKLAYER | $33.67 | $19.48 | $53.15 |
| TILE SETTER | $26.47 | $14.89 | $41.36 |
| CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $29.50 | $21.50 | $51.00 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $32.25 | $20.81 | $53.06 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 | $48.98 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 | $49.69 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | $18.07 | $49.69 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 |
| LABORER (LANDSCAPE) | $27.05 | $13.62 | $40.67 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) | $25.79 | $15.35 | $41.14 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 |
| ROOFER | $30.73 | $14.51 | $45.24 |
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $34.43 | $17.86 | $52.29 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.31 | $9.05 | $32.36 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.25 | $9.77 | $32.02 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 |
| OPERATOR: BACKHOE/TRACKHOE | $19.80 | $7.47 | $27.27 |
| LABORER: MASON TENDER - BRICK | $15.80 | $7.31 | $23.11 |
| LABORER: COMMON OR GENERAL | $14.99 | $6.99 | $21.98 |
| GLAZIER | $20.26 | $2.45 | $22.71 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $18.22 | $7.85 | $26.07 |