Sheet Metal Worker prevailing wages: New Mexico, county by county
51 current sheet metal worker rates across 30 active New Mexico wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Bernalillo | SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260044 Building |
| Bernalillo | SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $10.81 | $0.00 | $10.81 | NM20260001 Residential |
| Catron | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260013 Building |
| Catron | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260013 Building |
| Chaves | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260014 Building |
| Chaves | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260014 Building |
| Colfax | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260015 Building |
| Colfax | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260015 Building |
| Curry | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260016 Building |
| Curry | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260016 Building |
| De Baca | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260017 Building |
| De Baca | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260017 Building |
| Dona Ana | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260045 Building |
| Dona Ana, Valencia | SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $10.81 | $0.00 | $10.81 | NM20260003 Residential |
| Eddy | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260018 Building |
| Eddy | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260018 Building |
| Grant | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.15 | $0.54 | $33.69 | NM20260019 Building |
| Grant | SHEET METAL WORKER (INSTALLATION OF HVAC SYSTEM ONLY) | $37.50 | $18.51 | $56.01 | NM20260019 Building |
| Grant | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260019 Building |
| Hidalgo, Sierra | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260032 Building |
| Hidalgo, Sierra | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260032 Building |
| Lea | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260020 Building |
| Lea | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260020 Building |
| Lincoln | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260021 Building |
| Lincoln | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260021 Building |
| Los Alamos | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260022 Building |
| Los Alamos | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260022 Building |
| Los Alamos, Sandoval, Santa Fe | SHEET METAL WORKER (SETTING OF HVAC UNIT AND INSTALLATION OF DUCT WORK AND CONTROL WIRING ONLY) | $10.80 | $0.45 | $11.25 | NM20260006 Residential |
| Luna | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260023 Building |
| Luna | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260023 Building |
| McKinley | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260024 Building |
| McKinley | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260024 Building |
| Otero | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260025 Building |
| Otero | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260025 Building |
| Quay + 12 more | SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $14.43 | $0.58 | $15.01 | NM20260004 Residential |
| Quay + 5 more | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260031 Building |
| Quay + 5 more | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260031 Building |
| Rio Arriba | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260026 Building |
| Rio Arriba | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260026 Building |
| Roosevelt | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260027 Building |
| Roosevelt | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260027 Building |
| San Juan | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260046 Building |
| San Miguel | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260028 Building |
| San Miguel | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260028 Building |
| Sandoval | SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260047 Building |
| Santa Fe | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260048 Building |
| Socorro | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260029 Building |
| Socorro | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260029 Building |
| Torrance, Valencia | SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $37.50 | $18.51 | $56.01 | NM20260049 Building |
| Union | SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | NM20260030 Building |
| Union | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | NM20260030 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All New Mexico trades.