Santa Fe County, New Mexico: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NM20260048 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.66 | $11.83 | $48.49 |
| ELECTRICIAN | $40.30 | $13.41 | $53.71 |
| IRONWORKER, STRUCTURAL | $28.05 | $18.11 | $46.16 |
| PIPEFITTER | $43.07 | $16.60 | $59.67 |
| PLUMBER | $43.07 | $16.60 | $59.67 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $37.50 | $18.51 | $56.01 |
| PAINTER: SPRAY | $16.51 | $2.14 | $18.65 |
| PAINTER (BRUSH AND ROLLER) | $16.60 | $3.88 | $20.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.73 | $4.51 | $30.24 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.60 | $0.00 | $17.60 |
| LABORER: COMMON OR GENERAL | $14.58 | $4.25 | $18.83 |
| CEMENT MASON/CONCRETE FINISHER | $18.93 | $5.85 | $24.78 |
| CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING | $20.86 | $6.25 | $27.11 |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | $19.64 | $3.91 | $23.55 |
Heavy NM20260042 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | $13.18 | $40.49 |
| ELECTRICIAN | $34.50 | $10.81 | $45.31 |
| TRUCK DRIVER: DUMP TRUCK | $15.53 | $0.00 | $15.53 |
| LABORER: PIPELAYER | $16.67 | $3.04 | $19.71 |
| LABORER: COMMON OR GENERAL | $15.34 | $3.63 | $18.97 |
| IRONWORKER, REINFORCING | $27.80 | $0.00 | $27.80 |
| CEMENT MASON/CONCRETE FINISHER | $19.44 | $8.08 | $27.52 |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | $0.00 | $16.43 |
OPERATOR 7 classifications · $18.23 to $27.30 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | $0.00 | $18.83 |
| OPERATOR: OILER | $18.23 | $0.00 | $18.23 |
| OPERATOR: LOADER | $18.30 | $0.00 | $18.30 |
| OPERATOR: GRADER/BLADE | $19.02 | $0.00 | $19.02 |
| OPERATOR: BULLDOZER | $21.00 | $0.00 | $21.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | $0.00 | $21.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.12 | $6.18 | $27.30 |
Highway NM20260034 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BOOM OPERATOR) | $29.79 | $12.74 | $42.53 |
| TRUCK DRIVER: WATER TRUCK | $12.96 | $0.26 | $13.22 |
| TRUCK DRIVER: DUMP TRUCK | $15.04 | $0.26 | $15.30 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.95 | $0.26 | $13.21 |
| TRUCK DRIVER (FLATBED TRUCK) | $13.51 | $0.26 | $13.77 |
| LABORER: PIPELAYER | $17.13 | $5.04 | $22.17 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | $0.35 | $10.60 |
| LABORER: COMMON OR GENERAL | $11.21 | $0.35 | $11.56 |
| LABORER (FLAGGER/CONE SETTER) | $13.55 | $0.35 | $13.90 |
| IRONWORKER, REINFORCING | $22.44 | $5.85 | $28.29 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $14.75 | $0.35 | $15.10 |
| ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION) | $25.06 | $8.56 | $33.62 |
| CEMENT MASON/CONCRETE FINISHER | $14.60 | $0.26 | $14.86 |
| CARPENTER (INCLUDES FORM WORK) | $13.88 | $0.44 | $14.32 |
POWER EQUIPMENT OPERATOR 10 classifications · $12.26 to $30.80 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | $1.51 | $24.75 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.43 | $0.26 | $16.69 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | $1.51 | $19.15 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $12.00 | $0.26 | $12.26 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT AND DIRT)) | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $15.73 | $0.26 | $15.99 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/TRACKHOE) | $17.20 | $0.26 | $17.46 |
Residential NM20260006 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (SETTING OF HVAC UNIT AND INSTALLATION OF DUCT WORK AND CONTROL WIRING ONLY) | $10.80 | $0.45 | $11.25 |
| ROOFER | $9.87 | $0.00 | $9.87 |
| PLUMBER | $16.30 | $0.93 | $17.23 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $10.00 | $0.00 | $10.00 |
| LABORER, UNSKILLED | $8.18 | $0.00 | $8.18 |
| CARPENTER (EXCLUDING DRYWALL HANGING) | $12.00 | $0.00 | $12.00 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.