Highway construction wages: Santa Fe, New Mexico
Wage determination NM20260034 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NM20260034 on · latest revision 1 · verify at sam.gov/wage-determination/NM20260034/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BOOM OPERATOR) | $29.79 | $12.74 | $42.53 |
| TRUCK DRIVER: WATER TRUCK | $12.96 | $0.26 | $13.22 |
| TRUCK DRIVER: DUMP TRUCK | $15.04 | $0.26 | $15.30 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.95 | $0.26 | $13.21 |
| TRUCK DRIVER (FLATBED TRUCK) | $13.51 | $0.26 | $13.77 |
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | $1.51 | $24.75 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.43 | $0.26 | $16.69 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | $1.51 | $19.15 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $12.00 | $0.26 | $12.26 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT AND DIRT)) | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $15.73 | $0.26 | $15.99 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/TRACKHOE) | $17.20 | $0.26 | $17.46 |
| LABORER: PIPELAYER | $17.13 | $5.04 | $22.17 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | $0.35 | $10.60 |
| LABORER: COMMON OR GENERAL | $11.21 | $0.35 | $11.56 |
| LABORER (FLAGGER/CONE SETTER) | $13.55 | $0.35 | $13.90 |
| IRONWORKER, REINFORCING | $22.44 | $5.85 | $28.29 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $14.75 | $0.35 | $15.10 |
| ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION) | $25.06 | $8.56 | $33.62 |
| CEMENT MASON/CONCRETE FINISHER | $14.60 | $0.26 | $14.86 |
| CARPENTER (INCLUDES FORM WORK) | $13.88 | $0.44 | $14.32 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.