Roosevelt County, New Mexico: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NM20260027 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | $10.79 | $34.87 |
| ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS (ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 |
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | $4.65 | $36.08 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | $4.65 | $32.35 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 |
| IRONWORKER: ORNAMENTAL | $28.05 | $18.11 | $46.16 |
| IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY) | $28.05 | $18.11 | $46.16 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 |
| TRUCK DRIVER: WATER TRUCK | $16.25 | $5.00 | $21.25 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: DUMP TRUCK | $15.36 | $5.00 | $20.36 |
| TILE SETTER | $19.00 | $0.00 | $19.00 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 |
| ROOFER | $13.24 | $0.50 | $13.74 |
| PLASTERER | $17.65 | $7.15 | $24.80 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $16.58 | $1.75 | $18.33 |
| OPERATOR: GRADER/BLADE | $21.39 | $4.94 | $26.33 |
| OPERATOR: FORKLIFT | $21.13 | $4.83 | $25.96 |
| OPERATOR: BACKHOE | $22.13 | $4.30 | $26.43 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | $0.85 | $12.36 |
| LABORER: MASON TENDER - BRICK | $13.77 | $4.35 | $18.12 |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | $0.24 | $10.84 |
| LABORER: COMMON OR GENERAL | $13.12 | $3.79 | $16.91 |
| IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | $22.20 | $8.06 | $30.26 |
| IRONWORKER, REINFORCING | $20.84 | $7.68 | $28.52 |
| INSULATOR - BATT | $24.44 | $8.43 | $32.87 |
| GLAZIER | $20.15 | $3.95 | $24.10 |
| FLOOR LAYER: CARPET | $22.31 | $0.30 | $22.61 |
| DRYWALL FINISHER/TAPER | $19.64 | $2.75 | $22.39 |
| CEMENT MASON/CONCRETE FINISHER | $17.72 | $3.72 | $21.44 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $27.11 | $0.35 | $27.46 |
| CARPENTER (FORM WORK ONLY) | $19.79 | $6.14 | $25.93 |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | $2.85 | $24.24 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | $0.00 | $20.79 |
| BRICKLAYER | $20.36 | $5.74 | $26.10 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 |
Heavy NM20260012 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (HIDALGO AND LUNA COUNTIES) | $38.00 | $9.82 | $47.82 |
| ELECTRICIAN, ZONE 1 (DE BACA, GRANT, LINCOLN, ROOSEVELT, SIERRA & SOCORRO COUNTIES). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 |
| ELECTRICIAN, ZONE 1 (EDDY & LEA COUNTIES). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 |
| IRONWORKER: STRUCTURAL | $28.05 | $18.11 | $46.16 |
| TRUCK DRIVER: WATER TRUCK | $13.72 | $5.25 | $18.97 |
| TRUCK DRIVER: DUMP TRUCK | $11.90 | $0.00 | $11.90 |
| PLUMBER | $26.27 | $7.69 | $33.96 |
| PIPEFITTER | $25.64 | $11.31 | $36.95 |
| OPERATOR: SCRAPER | $14.03 | $0.00 | $14.03 |
| OPERATOR: LOADER (FRONT END) | $22.07 | $5.05 | $27.12 |
| OPERATOR: GRADER/BLADE | $18.79 | $2.35 | $21.14 |
| OPERATOR: BACKHOE | $14.03 | $0.00 | $14.03 |
| LABORER: FLAGGER | $10.90 | $0.00 | $10.90 |
| LABORER: COMMON OR GENERAL | $12.37 | $0.00 | $12.37 |
| IRONWORKER, REINFORCING | $22.75 | $9.60 | $32.35 |
| CARPENTER | $22.26 | $6.20 | $28.46 |
Highway NM20260036 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | $14.00 | $0.00 | $14.00 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | $16.58 | $0.26 | $16.84 |
| PAINTER (BRUSH, ROLLER, AND SPRAY) | $15.41 | $0.44 | $15.85 |
| LABORER, COMMON OR GENERAL (OTERO) | $12.73 | $0.35 | $13.08 |
| LABORER, COMMON OR GENERAL (LUNA, ROOSEVELT) | $12.56 | $0.35 | $12.91 |
| LABORER, COMMON OR GENERAL (LEA) | $11.61 | $0.35 | $11.96 |
| LABORER, COMMON OR GENERAL (GRANT) | $10.62 | $0.35 | $10.97 |
| LABORER, COMMON OR GENERAL (EDDY) | $11.78 | $0.35 | $12.13 |
| LABORER, COMMON OR GENERAL (DEBACA) | $11.33 | $0.35 | $11.68 |
| LABORER, COMMON OR GENERAL (CATRON, CHAVES, CURRY, HIDALGO, LINCOLN, SIERRA, SOCORRO) | $11.67 | $0.35 | $12.02 |
| LABORER (POWER/AIR TOOL OPERATOR, INCLUDES JACK HAMMER) | $13.91 | $0.86 | $14.77 |
| LABORER (PIPELAYER) | $19.28 | $0.00 | $19.28 |
| LABORER (MASON TENDER-BRICK/CEMENT/CONCRETE) | $11.39 | $0.79 | $12.18 |
| LABORER (GRADE CHECKER) | $16.18 | $1.60 | $17.78 |
| LABORER (FLAGGER/CONE SETTER) | $12.56 | $0.35 | $12.91 |
| LABORER (ASPHALT RAKER) | $13.00 | $0.35 | $13.35 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.03 | $27.80 |
| IRONWORKER, REINFORCING (LEA) | $21.77 | $6.03 | $27.80 |
| IRONWORKER, REINFORCING (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $21.66 | $6.03 | $27.69 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (LEA) | $14.62 | $0.30 | $14.92 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.58 | $0.35 | $13.93 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $15.93 | $0.35 | $16.28 |
| ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION (LEA) | $24.90 | $8.56 | $33.46 |
| ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $26.21 | $9.35 | $35.56 |
| CEMENT MASON/CONCRETE FINISHER (LEA) | $13.74 | $0.68 | $14.42 |
| CEMENT MASON/CONCRETE FINISHER (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.17 | $0.55 | $14.72 |
| CARPENTER, INCLUDES FORM WORK (LUNA) | $13.11 | $0.44 | $13.55 |
| CARPENTER, INCLUDES FORM WORK (LEA) | $13.30 | $0.44 | $13.74 |
| CARPENTER, INCLUDES FORM WORK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.93 | $0.44 | $14.37 |
TRUCK DRIVER 13 classifications · $12.86 to $15.33 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK (LEA) | $15.07 | $0.26 | $15.33 |
| TRUCK DRIVER: WATER TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.39 | $0.26 | $14.65 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (LEA) | $12.84 | $0.26 | $13.10 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (EDDY) | $12.60 | $0.26 | $12.86 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $12.70 | $0.26 | $12.96 |
| TRUCK DRIVER: FLATBED TRUCK (ROOSEVELT) | $13.26 | $0.26 | $13.52 |
| TRUCK DRIVER: FLATBED TRUCK (LEA) | $13.05 | $0.26 | $13.31 |
| TRUCK DRIVER: FLATBED TRUCK (EDDY) | $12.71 | $0.26 | $12.97 |
| TRUCK DRIVER: FLATBED TRUCK (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, SIERRA, SOCORRO) | $12.96 | $0.26 | $13.22 |
| TRUCK DRIVER: DUMP TRUCK (LEA) | $14.61 | $0.26 | $14.87 |
| TRUCK DRIVER: DUMP TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.60 | $0.26 | $14.86 |
| TRUCK DRIVER: DISTRIBUTOR (EDDY) | $13.70 | $0.26 | $13.96 |
| TRUCK DRIVER: DISTRIBUTOR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LEA, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.81 | $0.26 | $14.07 |
POWER EQUIPMENT OPERATOR 24 classifications · $14.76 to $20.95 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACTOR | $15.40 | $0.26 | $15.66 |
| POWER EQUIPMENT OPERATOR: SCREED | $15.70 | $0.26 | $15.96 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | $0.26 | $16.17 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (LEA) | $17.41 | $0.26 | $17.67 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (DEBACA) | $14.19 | $0.75 | $14.94 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (CATRON, CHAVES, CURRY, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $15.86 | $0.26 | $16.12 |
| POWER EQUIPMENT OPERATOR: OILER | $15.79 | $0.26 | $16.05 |
| POWER EQUIPMENT OPERATOR: MECHANIC (LEA) | $20.69 | $0.26 | $20.95 |
| POWER EQUIPMENT OPERATOR: MECHANIC (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.44 | $0.26 | $19.70 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.12 | $0.26 | $16.38 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $18.02 | $0.26 | $18.28 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | $0.26 | $17.42 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $16.25 | $0.26 | $16.51 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | $0.26 | $18.32 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (LEA) | $16.88 | $0.26 | $17.14 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EDDY) | $14.87 | $0.26 | $15.13 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.92 | $0.26 | $20.18 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.31 | $0.26 | $16.57 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $17.82 | $0.26 | $18.08 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.59 | $0.26 | $16.85 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | $0.26 | $14.76 |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | $0.26 | $16.79 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $15.48 | $0.26 | $15.74 |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $15.42 | $0.26 | $15.68 |
Residential NM20260005 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC WORK) | $12.00 | $0.00 | $12.00 |
| PLASTERER | $12.00 | $0.00 | $12.00 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $10.57 | $0.00 | $10.57 |
| LABORER, UNSKILLED | $8.36 | $0.00 | $8.36 |
| ELECTRICIAN (EXCLUDING HVAC WIRING) | $12.00 | $0.26 | $12.26 |
| DRYWALL FINISHER/TAPER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.50 | $0.00 | $12.50 |
| CARPENTER (FORM WORK ONLY) | $10.50 | $0.00 | $10.50 |
| CARPENTER (EXCLUDING FORM WORK, AND INSTALLATION OF DRYWALL AND SOFT FLOORS) | $11.69 | $0.30 | $11.99 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.