Building construction wages: Union, New Mexico
Wage determination NM20260030 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NM20260030 on · latest revision 2 · verify at sam.gov/wage-determination/NM20260030/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING ONLY) | $24.08 | $10.79 | $34.87 |
| ELECTRICIAN (ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.24 | $4.65 | $31.89 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $28.05 | $18.11 | $46.16 |
| LABORER, MASON TENDER BRICK | $23.69 | $7.89 | $31.58 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $24.00 | $7.00 | $31.00 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 |
| TRUCK DRIVER: WATER TRUCK | $15.16 | $4.69 | $19.85 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: DUMP TRUCK | $11.00 | $0.00 | $11.00 |
| TILE SETTER | $14.30 | $1.02 | $15.32 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.00 | $4.16 | $24.16 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 |
| ROOFER | $18.84 | $0.00 | $18.84 |
| PLASTERER | $17.65 | $5.29 | $22.94 |
| PAINTER: SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $15.47 | $2.09 | $17.56 |
| OPERATOR: LOADER (FRONT END) | $19.76 | $4.84 | $24.60 |
| OPERATOR: GRADER/BLADE | $20.33 | $4.94 | $25.27 |
| OPERATOR: FORKLIFT | $20.86 | $4.60 | $25.46 |
| OPERATOR: CRANE | $24.38 | $4.60 | $28.98 |
| OPERATOR: BACKHOE | $18.79 | $3.47 | $22.26 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | $0.85 | $12.36 |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | $1.47 | $13.89 |
| LABORER: COMMON OR GENERAL | $12.99 | $3.56 | $16.55 |
| LABORER: ASPHALT RAKER | $10.25 | $0.00 | $10.25 |
| IRONWORKER, REINFORCING | $19.75 | $8.71 | $28.46 |
| GLAZIER | $20.15 | $3.63 | $23.78 |
| FLOOR LAYER: CARPET | $18.05 | $4.49 | $22.54 |
| DRYWALL FINISHER/TAPER | $18.34 | $4.38 | $22.72 |
| CEMENT MASON/CONCRETE FINISHER | $17.61 | $4.63 | $22.24 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | $4.29 | $23.56 |
| CARPENTER (FORM WORK ONLY) | $18.80 | $5.61 | $24.41 |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | $5.96 | $32.03 |
| BRICKLAYER | $20.80 | $5.10 | $25.90 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 |
| ACOUSTICAL CEILING MECHANIC | $12.00 | $0.00 | $12.00 |