Building construction wages: Chaves, New Mexico

Wage determination NM20260014 · Active · Standard · verify on SAM.gov

Chaves

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
CARPENTER (INCLUDING METAL STUD INSTALLATION (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING AND FORM WORK))$29.09$16.20$45.29
ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS (ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE$40.30$13.41$53.71
POWER EQUIPMENT OPERATOR ((8) CRANE)$31.43$4.65$36.08
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END))$27.70$4.65$32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40
IRONWORKER: ORNAMENTAL$28.05$18.11$46.16
IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY)$28.05$18.11$46.16
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01
TRUCK DRIVER: WATER TRUCK$16.25$5.00$21.25
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04
TRUCK DRIVER: DUMP TRUCK$15.36$5.00$20.36
TILE SETTER$19.00$0.00$19.00
TILE FINISHER$14.02$0.00$14.02
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66
ROOFER$13.24$0.50$13.74
PLASTERER$17.65$7.15$24.80
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.58$1.75$18.33
OPERATOR: GRADER/BLADE$21.39$4.94$26.33
OPERATOR: FORKLIFT$21.13$4.83$25.96
OPERATOR: BACKHOE$22.13$4.30$26.43
LABORER: PIPELAYER$13.78$2.20$15.98
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36
LABORER: MASON TENDER - BRICK$13.77$4.35$18.12
LABORER: LANDSCAPE & IRRIGATION$10.60$0.24$10.84
LABORER: COMMON OR GENERAL$15.93$0.25$16.18
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION$22.20$8.06$30.26
IRONWORKER, REINFORCING$20.84$7.68$28.52
INSULATOR - BATT$24.44$8.43$32.87
GLAZIER$13.73$0.00$13.73
FLOOR LAYER: CARPET$22.31$0.30$22.61
DRYWALL FINISHER/TAPER$19.64$2.75$22.39
CEMENT MASON/CONCRETE FINISHER$18.97$0.00$18.97
ELECTRICIAN (Low Voltage Wiring for Alarms)$28.25$6.62$34.87
CARPENTER (FORM WORK ONLY)$19.79$6.14$25.93
CARPENTER (DRYWALL HANGING ONLY)$21.39$2.85$24.24
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$20.79$0.00$20.79
BRICKLAYER$20.36$5.74$26.10
BOILERMAKER$21.77$3.98$25.75